Site work for an educational facility in Sandy Lake, Ontario. Completed plans call for site work for a educational facility.

Sandy Lake First Nation (SLFN), in consultation with Ontario First Nations Technical Services Corporation (OFNTSC) and Indigenous Services Canada (ISC), is preparing to remediate two hydrocarbon contaminated sites in the community under a Design-Build Approach. The project scope entails remediation of 8 general areas within the two contaminated sites, totalling approximately 23,500 m2 of surface area and an estimated 110,000 m3 of impacted soil and sediments. Following the Pre-qualification Process, the Successful Short-listed Proponents Will Be Issued a Design-build Rfp Which Identifies the Remedial Scope of Work. Upon Conclusion of the Proposal Period the Project Team Intends to Evaluate and Identify a Preferred Proponent With Whom a Design-build Contract Will Be Negotiated. The Successful Design-builder Will Be Required to Perform the Following Scope of Work in General Terms (Not Required at This RFQ Stage): 1) to Undertake the Necessary Work and Provide Expert Advice, as Required, to Plan, Design and Implement an Effective and Efficient Remediation Methodology. 2) to Prepare a Detailed Site Remedial Action Plan That Provides a Description of the Remediation Approach and Corrective Measures to Be Performed 3) Develop Detailed Drawings and Specifications for All Remedial Work, Including Impacted Civil and Architectural Components as Required. 4) on-site Supervision to Ensure Compliance and Conformance to All Project Requirements; 5) Verification Sampling and Testing by an Scc Accredited Laboratory of Treated Materials, Discharged Materials, Materials Disposed of as Waste and Imported Materials to Ensure That Contamination Has Been Effectively Remediated; 6) Provide Documentation to Sufficiently Demonstrate That the Remedial Objectives Were Achieved With Signatures Confirming the Performance of the Site Remediation Plan, Its Findings and Conclusions and Ensuring That All Conflicts of Interest, if Any, Are Declared. 7) Optimal Utilization of Local Resources (Manpower, Equipment and Materials). 8) on-site Training for Local Personnel During the Construction and Treatment Phases. 9) Ensure That All Relevant or Applicable Permits and Approvals (Federal and Provincial) Are Obtained to Complete the Work. 10) to Provide Risk Management or Environmental Monitoring Services, as Required, to Ensure Effective Implementation of a Site Management Program. 11) to Perform the Remediation of All Impacted Soil, Sediments, and Groundwater in Accordance With the Detailed Drawings, Specifications, and Remediation Plan. The Key Objectives for This Project Are as Follows: 1) to Remediate Petroleum Hydrocarbon Impacts in the Soil, Groundwater and Sediment to Levels That Do Not Pose a Risk to Human Health or the Environment. 2) to Remediate Petroleum Hydrocarbon Impacts So That Slfn Can Develop the Properties. 3) to Minimize the Need for Imported Clean Backfill From Elsewhere in the First Nation. 4) to Minimize the Disturbance to the Community Core During Remediation. 5) to Achieve Remediation and Treatment Objectives Within a Fixed Timeframe (No Later Than Fall, 2027). Extended Treatment Solutions Beyond This Timeframe Are Not Desired. 6) to Implement a Remedial Action Plan That Utilizes Safe and Effective on-site Technologies, Prioritizes Environmental Sustainability and is Sensitive to Minimizing Greenhouse Gas Emissions. 7) to Implement the Work Under a Carefully Managed and Monitored Health and Safety Plan With Reporting Metrics. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline: 2024/01/12 04:00:00 PM EST

Post-Bid

Educational

$500,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
1
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2024

May 27, 2024

img_map_placeholder

Multiple Locations, Sandy Lake, ON


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.