BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a mixed-use development in Los Angeles, California. Working plans call for the construction of a 40,000-square-foot educational facility; for site work for a educational facility; and water / sewer project.

Per the owner, as of September 16, 2024, an award has been made for this solicitation. Design is anticipated to be completed by November 1, 2025 and construction is anticipated to begin in November 2025 and is anticipated to be completed on June 24, 2027. Closed solicitation has been included below for reference. ............ License Requirements B Estimated Bid Value 50,845,230 The Trustees of The California State University are requesting Statements of Qualifications (SOQ) from interested and qualified Design-Build Entities (Respondents) to participate in a competitive Request for Proposal (RFP) Process to provide design and construction services for the above-named Project. The Trustees will select a Design-Build Entity (a General Contractor/Construction Manager partnered with an Architect/Engineering team) using a two-step process: (1) this Request for Qualifications (RFQ) from which Respondents may submit SOQ to the Trustees, and (2) the Request for Proposals (RFP) which the Trustees will issue to the shortlisted firms. A technical review committee shall review the respondents' SOQs and, based on the criteria identified in the RFQ, the committee shall select no more than three finalists to receive the Request for Proposals. The Matador Success and Inclusion Center (MSIC) is a new campus building dedicated to housing the Identity Based Resource Centers, the Ethnic Studies Center for Research, Activism, and Community Empowerment (ES for RACE), the Community High Impact Programs (CHIP) group, the Matador Achievement Center (MAC), and the Athletics Administration offices. The facility will be a new stand-alone, approximately 40,000 Gross Square Feet (GSF) building. It will be situated at the northeast corner of Lindley Avenue and Vincennes Street by Redwood Hall. Site work, utilities, and accompanying improvements are additionally required. The California State University, Northridge campus is committed to facilitating access to educational opportunities in the region and is investing in opportunities to advance a culture of inclusive excellence through programming centered on equity, student success and belonging. This commitment will be emphasized in the design of the IBRC, CHIP and ES for RACE spaces. The MAC supports the academic success of student athletes and is being collocated with the Athletics Administration to demonstrate CSUN's commitment to the whole lives of our student athletes. This building and its location within the campus is a recognition of what the students and departmental entities bring to the campus. The new MSIC building is sited within a neighborhood of other buildings and open spaces that celebrate Matador equity, inclusion and belonging, including the new Autodesk Technology Engagement Center, the future Inclusion Quad, and the Sustainability Center The MSIC project seeks to create a place that focuses on the student experience, creates a culture of care and acknowledges underrepresented students and their intersecting identities. The building itself should capitalize on the potential synergies between entities and create spaces that allow the centers to create this community. Completion for the project is expected in July 2027. The new building will become the property of the Trustees of the California State University ("Trustees"), who will approve the schematic design. The Trustees will finance the project, select the design-build team through the RFQ/RFP process, and oversee design and construction. The contract will be administered through Facilities Planning, Design and Construction (FPDC) at the California State University, Northridge campus. The Trustees are responsible for the requisite environmental documentation. The preliminary anticipated design-build maximum acceptance cost for the MSIC is $50,845,230. The final design-build maximum acceptance cost for the project will be published in the RFP. Direct any prequalification questions to the Trustees' Prequalification Administrator at cocm.prequal@calstate.edu. The Trustees shall give a small business a bid advantage of five percent to contracting firms that have been certified as a "Small Business" by the Department of General Services, Office of Small Business and DVBE Services, in accordance with Contract General Conditions (and Supplementary General Conditions) for Design-Build Major Projects, Small Business Five Percent Bid Advantage. Additionally, the Trustees require three percent Disabled Veteran Business Enterprise (DVBE) participation in all contracts, in accordance with Contract General Conditions (and Supplementary General Conditions) for Design-Build Major Projects, DVBE Incentive. DVBE Participation (Incentive), 3.00% to 3.99% (None), 4.00% to 4.99% (1% incentive), 5.00% to 5.99% (2% incentive), 6% or more (3% incentive). When it nears time to bid trades, the selected construction manager shall contact the Trustees' DVBE Coordinator Jenni Cox, 818-677-6567, jenni.cox@csun.edu. Scope- The MSIC project seeks to create a place that focuses on the student experience, creates a culture of care and acknowledges underrepresented students and their intersecting identities. The building itself should capitalize on the potential synergies between entities and create spaces that allow the centers to create this community. Question Deadline 01/11/2024 at 5:00 PM PT Questions should be submitted in writing via email to Jenni Cox at the email at jenni.cox@csun.edu

Pre-Construction/Negotiated

Educational

$50,845,230.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
97
Bidding Soon
2,140
All Active Projects
948
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

November 1, 2025

img_map_placeholder

18111 Nordhoff St, Los Angeles, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.