BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Carson, California. Contact the soliciting agency for additional information.

***As of May 14, 2024. All bids rejected. rebid date not available at this time. DESCRIPTION: Bidders are invited to submit offers to salvage a Therma-Flite Dryer at the A.K. Warren Water Resource Facility (Warren Facility) located at 24501 S. Figueroa Street in Carson, California. SALVAGE ITEMS The Dryer consists of a feed hopper and pump, a biosolids dryer and several conveyors that lead to a final bin load out system. All equipment was in working condition when it was shut down in December 2016. Additional details on the equipment are provided in Exhibit A. The major components at the facility include: * One (1) 35 yd Feed Hopper * One (1) Seepex Progressive Cavity Feed Pump * One (1) Lot of Class 300# Feed Piping Spools * One (1) IC 1800 Bio-Scru Biosolids Dryer Model No. HSD 18D-23-5/4 * One (1) Set of Access Stairs * One (1) Condenser Model No. VS 1800 * One (1) Foul Air Fan, 1HP NYB blower fan * One (1) Discharge Conveyor * One (1) Cooling Conveyor * One (1) One (1) Transfer Conveyor * One (1) Distribution Conveyor * One (1) Load Out System * One (1) Thermal Fluid Heating System * One (1) Nitrogen Generator System * One (1) Mobile Building Structure Items not included in the salvage include: * Underground wiring or piping * Compressed air system * Electrical switchgear and transformers * Control panels * Tools, cabinets, etc. * Any equipment not specifically listed above. SCOPE OF WORK a. The Districts will disconnect all electric conductors, instrument wiring and conduits from the equipment skids. Electric conductors, instrument wiring and conduits will not be part of the salvage material. b. The Contractor will be responsible for disassembling, loading/unloading, removing, and transporting the dryer and all components listed. The contractor will assume the cost and liability of removing and transporting any salvaged equipment. c. Contractor must always maintain the jobsite clean and free of trip hazards, for the duration of the project including when work is not actually being performed. d. Contractor will be responsible for removing all debris associated with the dryer from the premises. Contractor will not be allowed to dispose of any materials on-site. All bids rejected.

Final Planning

Water / Sewer

Public - County

Service, Maintenance and Supply

5

5

2

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
110
Bidding Soon
2,322
All Active Projects
1,029
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

November 18, 2024

img_map_placeholder

24501 S Figueroa St, Carson, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.