BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Diego, California. Conceptual plans call for site work for a water / sewer project.

Estimated Bid Value Range between $15 Million and $20 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City has a need for a Design Professional and an environmental services consultant to support the demolition and replacement of Hodges Dam with a new RCC Dam (Project). The City intends to deliver construction of the Project via Construction Manager at Risk (CMAR) project delivery method. The Scope of Services for the Design Professional is separated into two major functions: Facility Design and Environmental Permitting. Facility Design shall include full engineering design, including construction documents, of the new RCC Dam and required permits by local and state jurisdictions. The new RCC Dam shall be designed and constructed per industry standards to meet DSOD dam safety and performance requirements and per the Department of Homeland Security's Cybersecurity & Infrastructure Security Agency (CISA) guidelines for Critical Infrastructure, and more specifically Dam Sector Security. The new RCC Dam will require full access control inside and out, downstream, upstream against watercraft, and on both abutments. Access Control shall include, but is not limited to, CCTV, detection systems, deterrents, signage, security fencing, and fiber network communication systems connected to the City's Security Operations Center. Facility Design shall include the design of a temporary bypass to be used during construction, for the protection and safety of the new RCC dam and site after rain/storm events. The primary tasks of Facility Design services include (1) Project Initiation and Scoping, (2) Design Development, (3) Agency Reviews and Permitting, (4) Construction Support, and (5) Commissioning and Record Documents. The City reserves the right to revise the RFP prior to the date that Proposals are due. Notifications of all revisions to the RFP shall be emailed to all potential Proposers. The City reserves the right to extend the date by which the Proposals are due. Last Date to Submit Written Questions: Friday, December 15, 2023

Conceptual

Water / Sewer

$20,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
44
Bidding Soon
739
All Active Projects
335
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2025

img_map_placeholder

To Be Determined, San Diego, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.