Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 13, 2023 at 7:00 PM
Updated January 29, 2024
Renovation of a residential development in Mobile, Alabama. Completed plans call for the renovation of a residential development.
o Remove existing HVAC unit. o Install a new heating and air conditioning system. (Goodman, Nutone, or equivalent) electric heat pump system. o The new unit shall be sufficient to properly heat and cool the entire house. o It shall be the contractor's responsibility to ensure that the new unit is properly sized. o New unit shall be high efficiency. Minimum of 14 seer. o Modify existing duct work to ensure proper operation of new unit. o Repair any damaged duct work. o Add any duct work necessary to ensure proper heating and cooling in all areas of house. o Upon completion of this scope of work all ductwork shall be insulated metal duct. Short runs of flexible duct may be used for connecting to supply registers and boots. o Ensure that all ductwork is well supported and properly strapped in place. o Ensure that return grille is working properly and of adequate size. o Replace all supply registers and return grill. o Clean any existing ductwork that will be re-used. o Insure attic is insulated to R-30 after all necessary repairs are done. o Homeowner shall be supplied with 12 additional filters and informed on the changing of filters and the frequency that they should be changed. o Install a new properly matched thermostat from a recognizable manufacturer. o A properly sized manufactured condensing unit pad must be used. o Existing pad may be re-used if it is not damaged and is of adequate size. o Pad must be level. o Contractor must educate Homeowner on proper operation and maintenance of new unit. o Manufacturer's consumer literature on the unit must be left with the Homeowner along with warranty information on the unit. o The contractor shall include all items necessary to ensure the proper operation of this unit. This includes all connections to the gas service, the electrical disconnect, and electrical service to the unit and venting to meet code.
Post-Bid
Residential Subdivision
$11,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
