Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Site work for a transportation facility in Chicago, Illinois. Completed plans call for site work for a transportation facility.
Description: Perimeter Fence Replacement in Southeast Airfield (Sbi-1) Bid Bond: Bids Requiring a Bid Deposit Must Be Accompanied by a Bid Bond, Provided by a Surety Company Authorized to Do Business in the United States, and Made Payable to the City of Chicago. A Scanned Copy of the Bid Bond Must Be Attached to the Online Bid Submission, With the Original Bond to Be Received by Dps Within 3 Business Days of the Bid Opening. Any Late Bids Received After Announced Date and Time, for the Opening of Bids, Will Not Be Accepted. Question Cut-Off Date/Time: 12/30/2025 at 4:00 PM All inquiries regarding the Bid Documents or procurement process may be directed to the Procurement Specialist via iSupplier Online Discussions or email at christopher.kusper@cityofchicago.org Estimated Project Cost: $3,000,000 - $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work consists of furnishing all means, methods, labor, materials, tools, equipment, transportation and services for performing the General Work, Civil Work, and Landscape Work as shown on the Drawings and as described in the Technical Specifications, including all appurtenant work and accessories, to the complete satisfaction of, approval and acceptance by the City. This includes, but is not limited to the following: The project work scope consists of the design and construction of approximately 7,800 feet of Airport Operational Area ("AOA") fence in the southeast airfield of O'Hare International Airport. The new fence is to include a wildlife deterrent barrier and will be vegetation free. This description of work is intended to be general in nature and is neither a complete description nor a limitation on the Work to be performed. Contractor must perform all Work described in the Contract Documents or reasonably inferable as necessary to produce the results specified therein, except to the extentspecifically indicated in the Contract Documents to be the responsibility of others. SBI-1 Requirement: 51% SBI-1
Sub-Bidding
Transportation Terminals
$5,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2026
April 13, 2026
N Field Blvd, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Dec 14 2023
Chicago, IL
Bid Date: Jan 19 2024
Chicago, IL
Bid Date: Jan 19 2024
Chicago, IL
Bid Date: Jan 09 2024
Chicago, IL
Bid Date: Jan 24 2024
Chicago, IL
Bid Date: Dec 21 2023
Chicago, IL
Bid Date: Jan 10 2024
Chicago, IL
Bid Date: Jan 08 2024
Chicago, IL
Bid Date: Jan 09 2024
Chicago, IL
Bid Date: Dec 21 2023
Chicago, IL
Bid Date: Jan 19 2024
Chicago, IL
Bid Date: Dec 19 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
