Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Atlanta, Georgia. Completed plans call for site work for a water / sewer project.
Reference Number 0000337341 The Public Works Department is seeking design and construction services required to deliver the Campbellton Pump Station and associated forcemain. The Campbellton Pump Station is currently targeted to have a capacity of approximately 6MGD. The forcemain will extend approximately 18,700LF and be comprised of 24inch DR11 HDPE piping. Question Deadline 01/31/2024 at 2:00 PM ET Questions are submitted online Yes, Information regarding the bid or bid requirements, either procedural or technical, may be obtained by submitting questions to: Purchasing Contact Name: James A. Jones Email: james.jones@fultoncountyga.gov Phone: 404-612-5818 . Participation Requirements - Minority Business Participation - Small Business Participation - Women-Owned Business Participation General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required - License Required - Safety Standards Plan. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % certified cashier's check must be submitted as bid security. 1.5 MGD or larger wastewater pump station with a construction value of not less than $3,000,000.00. *The County reserves the right to accept or reject any and/or all proposals, to waive irregularities and technicalities, and to request resubmission PROJECT REQUIREMENTS/SCOPE OF WORK The successful completion of this project will consist of the 80% project deliverables and the eventual construction of the Campbellton Pump Station and the associated forcemain GMP. The project will include, but not be limited to, the following: o Review the Schematic Design constraints and requirements provided in the RFP package. o Review site data. o Provide topographical and Level 3 utility survey. o Upon award, determine and provide design schedule of work. o Perform geotechnical analysis and surveys. o Submit list of required permits and approvals and apply for any permits and approvals required to maintain overall project schedule. o Design force main, site, site utilities, structures, and pumping stations. o Submit DB Concept Design, Design Development, and PD/B Construction Documents for review and guidance. o Complete a transient analysis for the force main. o Project Management. o Planning and development. o Provide easement and property documents. o Acquire easements and property for the construction of the project o Provide GMP at 80% design. 1. The Campbellton Pump Station and Force Main Project will construct one (1) new pump station, approximately nineteen thousand (19,000) linear feet of forcemain to serve the Campbellton development and surrounding areas. The pump station and force main are located in the City of Chattahoochee Hills, and the City of South Fulton. 2. The project will be constructed within the City Limits of Chattahoochee Hills, and the City of South Fulton. All cities are located within Fulton County, Georgia. A separate land disturbance permit will be planned for the portion of the project within each separate City. 3. The new Campbellton Pump Station will serve the proposed Campbellton development, Town Creek and Mill Branch sewer basins, and the surrounding area. The depth of the pump station shall be deep enough to provide 3-feet of cover over the proposed gravity systems to serve the Town Creek and Mill Branch sewer basin
Post-Bid
Water / Sewer
$3,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2024
May 6, 2024
Multiple Locations, Atlanta, GA
Related To This Project
Atlanta, GA
Bid Date: Jul 02 2024
Atlanta, GA
Bid Date: Jan 17 2024
Atlanta, GA
Bid Date: Jan 25 2024
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
Bid Date: Nov 09 2020
Atlanta, GA
Bid Date: Jun 19 2024
Atlanta, GA
Bid Date: Dec 20 2023
Atlanta, GA
Bid Date: Dec 20 2023
Atlanta, GA
Bid Date: Dec 20 2023
Atlanta, GA
--
Atlanta, GA
Bid Date: Feb 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.