Site work for a water / sewer project in Atlanta, Georgia. Completed plans call for site work for a water / sewer project.

Reference Number 0000337341 The Public Works Department is seeking design and construction services required to deliver the Campbellton Pump Station and associated forcemain. The Campbellton Pump Station is currently targeted to have a capacity of approximately 6MGD. The forcemain will extend approximately 18,700LF and be comprised of 24inch DR11 HDPE piping. Question Deadline 01/31/2024 at 2:00 PM ET Questions are submitted online Yes, Information regarding the bid or bid requirements, either procedural or technical, may be obtained by submitting questions to: Purchasing Contact Name: James A. Jones Email: james.jones@fultoncountyga.gov Phone: 404-612-5818 . Participation Requirements - Minority Business Participation - Small Business Participation - Women-Owned Business Participation General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required - License Required - Safety Standards Plan. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % certified cashier's check must be submitted as bid security. 1.5 MGD or larger wastewater pump station with a construction value of not less than $3,000,000.00. *The County reserves the right to accept or reject any and/or all proposals, to waive irregularities and technicalities, and to request resubmission PROJECT REQUIREMENTS/SCOPE OF WORK The successful completion of this project will consist of the 80% project deliverables and the eventual construction of the Campbellton Pump Station and the associated forcemain GMP. The project will include, but not be limited to, the following: o Review the Schematic Design constraints and requirements provided in the RFP package. o Review site data. o Provide topographical and Level 3 utility survey. o Upon award, determine and provide design schedule of work. o Perform geotechnical analysis and surveys. o Submit list of required permits and approvals and apply for any permits and approvals required to maintain overall project schedule. o Design force main, site, site utilities, structures, and pumping stations. o Submit DB Concept Design, Design Development, and PD/B Construction Documents for review and guidance. o Complete a transient analysis for the force main. o Project Management. o Planning and development. o Provide easement and property documents. o Acquire easements and property for the construction of the project o Provide GMP at 80% design. 1. The Campbellton Pump Station and Force Main Project will construct one (1) new pump station, approximately nineteen thousand (19,000) linear feet of forcemain to serve the Campbellton development and surrounding areas. The pump station and force main are located in the City of Chattahoochee Hills, and the City of South Fulton. 2. The project will be constructed within the City Limits of Chattahoochee Hills, and the City of South Fulton. All cities are located within Fulton County, Georgia. A separate land disturbance permit will be planned for the portion of the project within each separate City. 3. The new Campbellton Pump Station will serve the proposed Campbellton development, Town Creek and Mill Branch sewer basins, and the surrounding area. The depth of the pump station shall be deep enough to provide 3-feet of cover over the proposed gravity systems to serve the Town Creek and Mill Branch sewer basin

Post-Bid

Water / Sewer

$3,000,000.00

Public - County

Site Work

25

9

9

4

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
51
Bidding Soon
1,497
All Active Projects
520
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.