Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 15, 2024 at 7:00 PM

Updated January 29, 2024

Site work and new construction of a pre-engineered storage facility in Greenbrier, Arkansas. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The City of Wooster will be accepting sealed bids from licensed contractors for CONSTRUCTION ERECTION OF PRE-ENGINEERED METAL BUILDING. The metal building materials package is scheduled for delivery by Pinnacle Structures, Inc. of Cabot, AR to the site at 10 Church Circle, Wooster, AR prior to this bid opening. The building will support operations of the Wooster Wastewater Utility for warehousing, office space, and pump cleaning/testing. Successful bidder shall be a licensed contractor in the State of Arkansas and shall be sufficiently insured and bonded to provide the services to be contracted. A bid bond of 5% is required. Additional materials required for construction erection of the metal building that are not supplied in the materials package delivered by Pinnacle Structures, Inc. Bids must be submitted on the BID FORM (provided in bid documents obtained from the engineer of record mentioned above) in total with taxes included, for the price to be paid by the City of Wooster. Direct questions and requests for clarifications related to this can be sent to Mayor Terry Robinson at 501-733-0723. The City of Wooster reserves the right to accept or reject any or all bids placed and waive formalities.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$145,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
42
Bidding Soon
490
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2023

January 22, 2024

Project location map

10 Church Cir, Greenbrier, AR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed