BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Greenbrier, Arkansas. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The City of Wooster will be accepting sealed bids from licensed contractors for CONSTRUCTION ERECTION OF PRE-ENGINEERED METAL BUILDING. The metal building materials package is scheduled for delivery by Pinnacle Structures, Inc. of Cabot, AR to the site at 10 Church Circle, Wooster, AR prior to this bid opening. The building will support operations of the Wooster Wastewater Utility for warehousing, office space, and pump cleaning/testing. Successful bidder shall be a licensed contractor in the State of Arkansas and shall be sufficiently insured and bonded to provide the services to be contracted. A bid bond of 5% is required. Additional materials required for construction erection of the metal building that are not supplied in the materials package delivered by Pinnacle Structures, Inc. Bids must be submitted on the BID FORM (provided in bid documents obtained from the engineer of record mentioned above) in total with taxes included, for the price to be paid by the City of Wooster. Direct questions and requests for clarifications related to this can be sent to Mayor Terry Robinson at 501-733-0723. The City of Wooster reserves the right to accept or reject any or all bids placed and waive formalities.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$145,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
45
Bidding Soon
499
All Active Projects
195
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 20, 2023

January 22, 2024

img_map_placeholder

10 Church Cir, Greenbrier, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.