Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a mixed-use development in Farrell, Pennsylvania. Completed plans call for the renovation of a stadium; and for site work for a stadium.
New Visitor-Side Bleachers for the Farrell Area School District Stadium, 1600 Roemer Blvd., Farrell, PA 16121. It is the intent of the Owner to enter into separate contracts as follows: Contract No. 1 General Construction. Contract No. 2 Electrical Construction No Construction Estimates are available Single Prime Contract Bids shall include a Bid Security Bond or Certified Check, payable to Farrell Area School District, in an amount of five percent (5%) of the bid, in accordance with Instructions to Bidders, as included in the Contract Documents. Such Bid Bond or Check shall be submitted with the understanding that it shall guarantee that the Bidder's Bid will not be withdrawn for a period of at least sixty (60) days after the scheduled closing time for receipt of bids; that if the Bid is accepted, the Bidder will execute the Form of Agreement, as provided by the Owner, with all blanks appropriately filled and will submit the required 100% Performance and Labor and Material Bonds (submitted on A.I.A. Document A312) and 100% Maintenance Bond as specified in Section 007216, Article 11; and that in the event of withdrawal of said Bid within said period, or the failure to enter into said Agreement and submit said Bonds within ten days after the Bidder has received notice of the acceptance of the Bid, the Bidder shall be liable to the above mentioned Owner for the full amount of such Bond or Check as representing the damage to the Owner on account of the default of the Bidder in any particular hereof. The Bid Bond or Check of all Bidders whose Bids are not accepted will be returned within ten calendar days after the scheduled bid opening date. 1. Contractor's withdrawal of Bid: a. A bidder may only withdraw a bid if there is an honest and good-faith mistake (which must be supported by evidence) in the calculation of the bid price. A bidder has two business days from bid opening to withdraw a bid. b. The Owner reserves the right to accept or decline the Contractor's Withdrawal of Bid Request and reserves the right to retain the bid bond. c. A bidder who withdraws a bid will not be permitted to bid on the project a second time (should it be rebid) or provide any work or materials to the project. d. If the Owner chooses to rebid the project, the bid bond of the withdrawing bidder will be forfeited to the Owner to supplement the rebid costs.
Post-Bid
Arenas / Stadiums
$508,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2024
February 29, 2024
1600 Roemer Blvd, Farrell, PA
Related To This Project
Farrell, PA
Bid Date: Jan 30 2024
Farrell, PA
Bid Date: Dec 01 2023
Farrell, PA
Bid Date: Nov 02 2023
Farrell, PA
Bid Date: Mar 21 2022
Farrell, PA
Bid Date: Jul 06 2023
Farrell, PA
Bid Date: May 10 2023
Farrell, PA
Bid Date: Jul 29 2022
Farrell, PA
Bid Date: Apr 22 2022
Indiana, PA
Bid Date: Dec 26 2023
Pittsburgh, PA
--
West Hanover, PA
Bid Date: Dec 27 2023
Glen Rock, PA
Bid Date: Dec 14 2023
Madison Township, PA
--
German Township, PA
Bid Date: Dec 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.