BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Farrell, Pennsylvania. Completed plans call for the renovation of a stadium; and for site work for a stadium.

New Visitor-Side Bleachers for the Farrell Area School District Stadium, 1600 Roemer Blvd., Farrell, PA 16121. It is the intent of the Owner to enter into separate contracts as follows: Contract No. 1 General Construction. Contract No. 2 Electrical Construction No Construction Estimates are available Single Prime Contract Bids shall include a Bid Security Bond or Certified Check, payable to Farrell Area School District, in an amount of five percent (5%) of the bid, in accordance with Instructions to Bidders, as included in the Contract Documents. Such Bid Bond or Check shall be submitted with the understanding that it shall guarantee that the Bidder's Bid will not be withdrawn for a period of at least sixty (60) days after the scheduled closing time for receipt of bids; that if the Bid is accepted, the Bidder will execute the Form of Agreement, as provided by the Owner, with all blanks appropriately filled and will submit the required 100% Performance and Labor and Material Bonds (submitted on A.I.A. Document A312) and 100% Maintenance Bond as specified in Section 007216, Article 11; and that in the event of withdrawal of said Bid within said period, or the failure to enter into said Agreement and submit said Bonds within ten days after the Bidder has received notice of the acceptance of the Bid, the Bidder shall be liable to the above mentioned Owner for the full amount of such Bond or Check as representing the damage to the Owner on account of the default of the Bidder in any particular hereof. The Bid Bond or Check of all Bidders whose Bids are not accepted will be returned within ten calendar days after the scheduled bid opening date. 1. Contractor's withdrawal of Bid: a. A bidder may only withdraw a bid if there is an honest and good-faith mistake (which must be supported by evidence) in the calculation of the bid price. A bidder has two business days from bid opening to withdraw a bid. b. The Owner reserves the right to accept or decline the Contractor's Withdrawal of Bid Request and reserves the right to retain the bid bond. c. A bidder who withdraws a bid will not be permitted to bid on the project a second time (should it be rebid) or provide any work or materials to the project. d. If the Owner chooses to rebid the project, the bid bond of the withdrawing bidder will be forfeited to the Owner to supplement the rebid costs.

Post-Bid

Arenas / Stadiums

$508,000.00

Public - City

Renovation, Site Work

14

21

13

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
48
Bidding Soon
1,128
All Active Projects
410
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

February 29, 2024

img_map_placeholder

1600 Roemer Blvd, Farrell, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.