Renovation of a mixed-use development in Battle Creek, Michigan. Completed plans call for the renovation of a educational facility.

Summary of the Project Lakeview School District would like to perform some major cosmetic and functional upgrades to the interior classroom walls of Lakeview High School, Riverside Elementary, and Westlake Elementary - approximately 92 classrooms in total. The purpose for this renovation was primarily driven to clear and prepare the front of each classroom wall for fixed-mounting 86" interactive flat panel monitors (hereby referred to as "IFP") directly to the masonry wall in the center of the front classroom wall. In addition, the district would like to modernize the paint finish on the interior classroom walls, improve the accessibility of power receptacles, and replace the older whiteboards and cork boards with sturdy, magnetic whiteboards. It is the desire of Lakeview School District to combine these ambitions into a single coordinated project spanning across the summer months of 2024. A digital copy of this RFP with active hyperlinks can be accessed by scanning the QR code in the top left corner of this page. The Project Will Involve, but not be Limited to: Moving/Packing/Unpacking: Packing/moving supplies, equipment, and furniture out of the classroom to a location secure from dust and debris Packing/moving supplies, equipment, and furniture back into the classroom once renovation is complete Abatement/Demolition and Cleanup: Removal of existing whiteboards, corkboards, chalkboards, molding or trim, or miscellaneous brackets/fixtures Full removal of asbestos-containing construction adhesive on the walls Cleanup of dust and/or debris as a result of the demolition There will be no removal of casework in any building Painting/Smoothing/Refinishing: Removal or repair of any textures, obstacles, protrusions, or abrasions to wood trim, masonry wall, or drywall that would otherwise prevent a reasonably durable, flat, or smooth paint finish Application of long-lasting, durable paint finish with the colors determined by district administration Whiteboard Installation: Lakeview School District will provide the whiteboards, but potential bidders will need to install them A range of 2 to 5 whiteboards will be installed per classroom, with 4 installations on average Exact placement of whiteboards will be determined per classroom by Lakeview School District Electrical: Rerouting of low-voltage HVAC or speaker cabling, raceway and/or conduit Removal and/or rerouting of line-voltage cabling, raceway and/or conduit New installation and/or rerouting of line voltage circuits, concealed with conduit and/or raceway There will not be any installation or removal of Category 6 cabling required for this project Bid Security in the form of a certified check in the amount of 5% of the bid payable to Lakeview School District is acceptable bid security only for proposals less than $50,000. Bid Security in the form of bonds is required to be submitted with all proposals greater than $50,000. . Any additional questions or requests for information should be directed to: Fred Harris Frank Schumacher Director of Technology Director of Operations fharris@lakeviewspartans.org fschumacher@lakeviewspartans.org Lakeview School District Lakeview School District 15 Arbor Street 15 Arbor Street Battle Creek, MI 49015 Battle Creek, MI 49015 269.565.3999 269.565.3996 Addresses for Each School Building Lakeview High School 15060 Helmer Road South, Battle Creek, MI 49015 Riverside Elementary School 650 Riverside Drive, Battle Creek, MI 49015 Westlake Elementary School 1184 24th Street South, Battle Creek, MI 49015 Timeline The summer term for Lakeview School District begins at 12:00PM on Friday, May 31st with the last trade needing to wrap up no later than Monday, August 9th. It is possible that electrical work can begin prior to summer, perhaps during spring break, such as new conduit/raceway installation that does not impede the functionality of the classroom. There may be some light packing that can be done during the week of May 28th, but abatement and demolition cannot begin until school is released for the summer and the respective classrooms have been secured from dust and debris. Once a classroom is packed and/or protected from debris, abatement and demolition can take place. There will need to be coordination between the remaining trades, facilitated by Lakeview School District, to complete this project in a timely manner.

Award

Educational

$53,930.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
35
Bidding Soon
829
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Battle Creek, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.