Published July 26, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Houston, Texas. Completed plans call for site work for a water / sewer project; and bridge / tunnel.

This project is for the reconstruction of two (2) stormwater headwalls/culverts. One is at EFD Ditch C on the south side of the airfield just north of Horsepen Gully, and the other is northwest of RWY 4/22. Questions will be due from bidders at 3:00 p.m. CT, January 11, 2023. Pre-bid Meeting Questions will be due from bidders questions must be in writing and submitted to Ola Alhammami via email: ola.alhammami@houstontx.gov Award Date (estimated): 3/11/2024 If offer is accepted, Contractor shall achieve Date of Substantial Completion within 180 Calendar Days after Date of Commencement of the Work, subject to adjustments of Contract Time as provided in the Contract.

Award

Bridges / Tunnels

$1,291,523.00

Public - City

Site Work

4

13

41

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts, Concrete Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
62
Bidding Soon
2,335
All Active Projects
948
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

EFD Drainage Rehabilitation and Upgrade at Ellington Airport

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.