BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Arlington, Texas. Completed plans call for the renovation of a educational facility.

Timberview High School Field House Repairs A. Work Included: 1. Contractor shall comply with the following requirements concerning scope and work restrictions. 2. If the Contractor believes that meeting the restrictions in this section would cause a delay to the intended schedule, they shall issue an RFI requesting specific modifications to that specific Work Restriction that would permit construction to continue without delay and indicating the reasons for the request. If construction proceeds without meeting any of the restriction requirements or obtaining approval for a modification of these requirements, the Contractor shall be responsible for all costs associated with removing and replacing all construction that occurred in violation of the Work Restrictions, if directed to by the Architect, without any increase in approved construction costs or schedule for the project. B. Related Work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 01 of these Specifications. 2. The work of other contracts is described in various contract documents prepared therefore, some of which are in the possession of the Owner and are available for inspection by interested parties. C. Specific Project Restrictions: 1. Contractor shall be advised that the school will be operating during the duration of this project. 2. Contractor shall coordinate with the Owner any activities which will disrupt normal school operations. 3. Before project completion and a certificate of occupancy is issued, Contractor shall provide fully established grass at locations including but not limited to all disturbed areas, under items that have been stored on site, construction trailers and storage units. 4. Contractor may begin construction on or about January 24, 2024 and shall be substantially complete on July 26, 2024

Award

Educational

$550,000.00

Public - City

Renovation

11

17

2

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
98
Bidding Soon
3,607
All Active Projects
1,426
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.