BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Site work for a water / sewer project in College Station, Texas. Completed plans call for site work for a water / sewer project.

**As of December 16, 2025, the project was awarded to Norman Construction Services, LLC but the awarded amount is not available.** https://www.gurufocus.com/news/3219661/fluor-breaks-ground-on-state-highway-6-project-in-bryancollege-station-texas Fluor Corporation (NYSE: FLR) today joined officials from the Texas Department of Transportation (TxDOT), local leaders and community members to celebrate the groundbreaking of the State Highway 6 (SH-6) expansion project in Bryan/College Station, Texas. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20251120478188/en/ processed-09AE999A-5A38-47ED-8FF1-6B67A9A279CD.jpg (l-r): Bryan/College Station Metropolitan Planning Organization Executive Director Dan Rudge; Acting Brazos County Judge Kyle Kacal; College Station Mayor John Nichols; Fluor President of Infrastructure Shawn West; TxDOT Bryan District Engineer Chad Bohne; Texas House of Representatives for District 14 Paul Dyson; Bryan Mayor Pro Tem James Edge; Bryan/College Station Chamber of Commerce President Glen Brewer. The project, awarded to Fluor’s Infrastructure business earlier this year, marks a significant milestone in improving mobility and safety along one of the region’s most critical transportation corridors. The 12-mile stretch of SH-6 will be reconstructed and widened from two to three lanes in each direction, enhancing capacity for commuters, freight and emergency evacuation routes. “This groundbreaking signifies the start of an exciting expansion of SH-6 that will boost traffic capacity, strengthen regional connectivity and create a safer, more efficient route for everyone,” said Shawn West, President of Fluor’s Infrastructure business. “We are proud to partner with TxDOT once again to deliver an infrastructure project that supports Texas’ continued growth and prosperity.” As part of the Texas Triangle, SH-6 serves as a vital north-south artery for Bryan/College Station, Texas A&M University and Brazos County. It is also a key component of the Texas Highway Freight Network, the Texas Highway Trunk System and a designated Hurricane Evacuation Route. Construction is expected to be completed by the end of 2030. About Fluor Corporation Fluor Corporation (NYSE: FLR) is building a better world by applying world-class expertise to solve its clients’ greatest challenges. Fluor’s nearly 27,000 employees provide professional and technical solutions that deliver safe, well-executed, capital-efficient projects to clients around the world. Fluor had revenue of $16.3 billion in 2024 and is ranked 257 among the Fortune 500 companies. With headquarters in Irving, Texas, Fluor has provided engineering, procurement, construction and maintenance services for more than a century. For more information, please visit www.fluor.com or follow Fluor on Facebook, Instagram, LinkedIn, X and YouTube. -------------------------------- The project involves the relocation of existing water and sewer infrastructure under and along SH6. The project includes approximately 1200-lf of waterline and 150-lf of sewer line, including bores under SH6. Question Deadline 11/07/2025 at 5:00 PM CT - Questions and inquiries about this RFP should be submitted in writing via the Q&A feature available through the Brazos Valley e-Marketplace ("Bidding System"). The project involves the relocation of existing water and sewer infrastructure under and along SH6. The project includes approximately 1200-lf of waterline and 150-lf of sewer line, including bores under SH6. All proposals shall follow the format provided by the City of College Station. The City is seeking a construction company with quality experience in utility reconstruction. Statement of Work: o Removal of existing utilities. o Installation of bores under SH6. o Construction of water/waste water lines. o Contractor shall coordinate all work, inspections, and approvals with the City of College Station. o Contractor shall coordinate with residents when impacting adjacent properties. o Contractor shall not disrupt solid waste collection or postal services. o Project shall comply with the United States Occupational Safety & Health Administration regulations. o Methods & Means of construction shall be compliant with all applicable Federal, State, and Local regulations. This includes obtaining all necessary permits and inspections. o Contractor to adhere to City of College Station construction administration procedures. o Maintain and submit all project records such as record drawings, project manuals, and warranties for approval by the City of College Station. Earliest Award by City December 2025

Award

Water / Sewer

$4,500,000.00

Public - City

Site Work

7

9

7

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
372
Active Projects
202
Bidding Soon
3,547
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2025

January 19, 2026

Project location map

Hwy 6, College Station, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.