Site work for a water / sewer project in Darlington, South Carolina. Completed plans call for site work for a water / sewer project.

https://www.arlnow.com/2024/02/23/arlingtons-existing-sewage-infrastructure-can-support-at-least-20-years-of-growth-county-says/ The Arlington County Board could approve a new sewer plan for the first time in 22 years tomorrow (Saturday). The proposed Sanitary Sewer Collection System Plan is designed to prepare the county for continued growth through 2045. Despite the surge in development planned for the county over the next two decades, the plan does not call for expanding Arlington's current sewer infrastructure. Instead, according to a county report, the most substantial change would be an increase in how often the county cleans out small-diameter sanitary sewers. Flushing pipes of 12 inches in diameter and less every five years would cost $330,000 annually, increasing the average household's water bill by about $2.11 each year. The Arlington County Board is scheduled to vote on the proposed plan at a meeting tomorrow morning. The reason the county does not need more sewer lines, according to a staff presentation to the Planning Commission last week, is that plumbing fixtures and appliances have become more efficient over time. Every day, Arlington uses about 5 million gallons of water less than when the county approved the current sewer plan in 2002. This is despite the fact that the county has about 46,000 more residents than it did 22 years ago. "The trends are going the right way," Planning Commissioner James Lantelme said last week. "We're using less water." Population growth between now and 2045 is expected to increase Arlington's water usage by about 27%, or 6 million gallons per day, according to the presentation. This is still less than the county used in the late 1990s. __________________________________________________________ Scope of work includes the installation of approx. 59 water services, 34,328 lf of service line (3/4" - 1-1/2") to private line tie-in. Construction Cost Range: $600,000 - $750,000 100% Performance & Payment bonds, 5% Bid bond are required. The Owner reserves the right to waive any irregularities, or to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening. Bidders must comply with all applicable state and federal requirements identified in the bid documents including Davis-Bacon and American Iron & Steel provisions (AIS). Prospective bidders must implement procedures using Good Faith Efforts that ensure DBE firms are given opportunities for meaningful participation if subcontracts are awarded as per SRF Appendix A-"Equivalency". *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $600,000 - $750,000

Award

Water / Sewer

$637,092.00

Public - County

Site Work

60

9

5

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
134
Bidding Soon
1,567
All Active Projects
692
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 30, 2024

February 29, 2024

August 27, 2024

img_map_placeholder

Multiple Locations, Darlington, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.