BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Hartford, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

A. The Contractor shall be responsible for all necessary barricades and have enough barricades on the job to direct traffic (either pedestrian or driven) around the newly poured concrete. Caution tape is not considered to be a barricade and is not acceptable as barricade substitutes. B. If necessary, the Contractor shall provide continuous on-site inspection of the newly poured concrete until it is set to a point beyond potential damage by vandals. C. The work will consist of saw cutting and/or removing existing concrete, asphalt, topsoil, tree roots or other objects in the way of the designated line and grade of the proposed concrete. The Contractor shall be responsible for having a mechanical plate tamper on-site and he shall firmly compact each surface upon which concrete is to be poured with that tamper. The Contractor shall saw cut existing concrete edges as indicated at each job site. Broken existing edges shall not be acceptable. The estimated budget is $40,000. Major items include approximately 12,000 square feet of sidewalks within the City of Hart along with associated saw cutting, concrete removal, grading to blend to surrounding lawns and surfaces, topsoil, seed and mulch. The Contractor shall be responsible for all necessary barricades and have enough barricades on the job to direct traffic (either pedestrian or driven) around the newly poured concrete. Caution tape is not considered to be a barricade and is not acceptable as barricade substitutes. If necessary, the Contractor shall provide continuous on-site inspection of the newly poured concrete until it is set to a point beyond potential damage by vandals. The work will consist of saw cutting and/or removing existing concrete, asphalt, topsoil, tree roots or other objects in the way of the designated line and grade of the proposed concrete. The Contractor shall be responsible for having a mechanical plate tamper on-site and he shall firmly compact each surface upon which concrete is to be poured with that tamper. The Contractor shall saw cut existing concrete edges as indicated at each job site. Broken existing edges shall not be acceptable. The City of Hart reserves the right to accept or reject any bid under these terms. The City of Hart shall not pay for cold weather protection or cold weather additives to the concrete. All work shall be completed prior to the necessitated use of these items. The Contractors shall in general be required to have installed or begun installation of assigned jobs within two months of the receipt of Notice of Award and all work shall be completed and billed to the TIFA by November 30, 2024. Selected Contractor shall submit a bid bond or cashier's check in the amount of five percent (5%) of the total proposed value made out to the City of Hart. This value will be forfeited by the proposer should the selected firm fail to execute the contract. The contract may be extended for one additional year at the same per unit prices if it is mutually agreeable to both the Contractor and the City of Hart and/or Hart TIFA. Such an extension shall be subject to City of Hart and/or TIFA approval prior to commencement of work for the 2025 Calendar Year which will begin after January 1, 2025 and end December 31, 2025. If you have any questions, please contact Nichole Kleiner at (231) 923-0920, nkleiner@cityofhart.org

Award

Sidewalks / Parking Lot

$116,950.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
63
Bidding Soon
788
All Active Projects
361
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2024

January 1, 2025

img_map_placeholder

Multiple Locations, Hartford, MI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.