BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Visalia, California. Working plans call for site work for a playground / park / athletic field.

Reference Number 0000337573 The City of Visalia is requesting proposals from qualified firms to design and install a playground structure at John Combs Park, located at 3031 S. Crenshaw Street in Visalia, CA. This public works project is funded by federal award grant SLFRP2005, awarded to the City of Visalia by the US Department of the Treasury. Federal funds being utilized for this project are ARPA funds, and vendor will be responsible to adhere to state and federal funding requirements. Job Location 3031 S. Crenshaw Street, Visalia, CA Question Deadline 01/11/2024 at 4:00 PM PT Questions are submitted online No, Direct all questions to the Visalia Purchasing Division (559) 713-4334. To prevent misinterpretation, the Purchasing Division prefers that all questions be submitted in writing via email to purchasing@visalia.city. General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Federally Funded - Installation Required - Insurance Required - Prevailing Wage Required - Warranty Information Required REQUIRED BONDS: Awarded Contractor shall be required to submit a Performance Bond in the amount of one hundred percent (100%) of the agreement, as surety condition for the full, complete and faithful performance of the agreement. In addition, Awarded Contractor shall be required to furnish a Labor and Materials Bond in the amount of one hundred percent (100%) of the agreement if subcontractors are proposed to be used to complete this project. LICENSE REQUIREMENTS: No bid will be accepted from a Contractor who is not duly licensed in accordance with the provisions of Chapter 9, Division III of the State of California Business and Professions Code and has a current Class D-34 Contractor's license (minimum). See Section III for additional Department of Industrial Relations Requirements applicable to this project The City of Visalia does not provide an Engineer's Estimate, however the total approved budget for this project is approximately $230,000 which is an estimate of the total project delivery costs. PROJECT COMPLETION: Contractor shall order playground equipment and shade structure within ten (10) days of receiving the Notice to Proceed and complete the project within forty-five (45) working days after equipment has been delivered. *The right is reserved by the City of Visalia to reject any or all proposals, to waive any irregularities or informalities not affected by law, to evaluate the proposals submitted and to award the contract according to the proposal which best serves the interests of said City. Required Products John Combs Playground Design (2) Work is to include: o The demolition and removal of the existing playground structure. o Design of a 2 to 5 and a 5 to 12 age-appropriate play system within the constructed play area boundaries, with minimal to no alterations to existing concrete curbs, equipment footings, landing mats. o Design of a free-standing sail type shade structure to provide maximum coverage over entire playground structure. o A minimum of twelve (12) inches of wood fiber fall zone material installed. o Installation of all playground equipment and shade structure. o Certified safety inspection of completed playground structure. This project will be the final turnkey step in completing the overall John Combs Park Playground Replacement Project. Playground Suppliers shall submit a maximum of (2) two designs per age-appropriate playground. The City of Visalia requires Suppliers to design a play system that meets or exceeds all current federal CPSC, ASTM, IPEMA standards and ADA requirements. The proposals shall include the cost of play systems, shade structure design and cost, inclusive of the equipment structures, detailed technical installation instructions and maintenance & operations manuals from manufacturer. The City of Visalia shall be exempt for any liability for costs incurred by unsuccessful Proposers/Suppliers in preparation of the proposa

Final Planning

Playgrounds / Parks / Athletic Fields

$230,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
23
Bidding Soon
399
All Active Projects
170
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

February 26, 2024

img_map_placeholder

3031 S Crenshaw St, Visalia, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.