Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Visalia, California. Working plans call for site work for a playground / park / athletic field.
Reference Number 0000337563 The City of Visalia is requesting proposals from qualified firms to design and install a playground structure at Pinkham Park, located at 1000 S. Pinkham Street in Visalia, CA. This public works project is funded by federal award grant SLFRP2005, awarded to the City of Visalia by the US Department of the Treasury. Federal funds being utilized for this project are ARPA funds, and vendor will be responsible to adhere to state and federal funding requirements. Job Location 1000 S. Pinkham Street, Visalia, CA Question Deadline 01/11/2024 at 4:00 PM PT Questions are submitted online No, Direct all questions to the Visalia Purchasing Division (559) 713-4334. To prevent misinterpretation, the Purchasing Division prefers that all questions be submitted in writing via email to purchasing@visalia.city. The City of Visalia is requesting proposals from qualified firms to provide the design and installation of new playground equipment and safety inspection for one (1) playground structure at Pinkham Park located at 1000 S. Pinkham Street in Visalia, CA. This project is supported, in whole or in part, by federal award number SLFRP2005, awarded to City of Visalia by the U.S. Department of the Treasury. Federal Funds being utilized for this project are American Rescue Plan Act Funds (ARPA). Work is to include: o The demolition and removal of the existing playground structure. o Design of a 5 to 12 age-appropriate play system within the constructed play area boundaries, with minimal to no alterations to existing concrete curbs, equipment footings, landing mats. o Design of a free-standing sail type shade structure to provide maximum coverage over entire playground structure. o A minimum of twelve (12) inches of wood fiber fall zone material installed. o Installation of all playground equipment and shade structure. o Certified safety inspection of completed playground structure. This project will be the final turnkey step in completing the overall Pinkham Park Playground Replacement Project. Playground Suppliers shall submit a maximum of (2) two designs per age-appropriate playground. The City of Visalia requires Suppliers to design a play system that meets or exceeds all current federal CPSC, ASTM, IPEMA standards and ADA requirements. The proposals shall include the cost of play systems, shade structure design and cost, inclusive of the equipment structures, detailed technical installation instructions and maintenance & operations manuals from manufacturer. The City of Visalia shall be exempt for any liability for costs incurred by unsuccessful Proposers Suppliers in preparation of the proposal General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Federally Funded - Installation Required - Insurance Required - Prevailing Wage Required - Warranty Information Required PROJECT COMPLETION: Contractor shall order playground equipment and shade structure within ten (10) days of receiving the Notice to Proceed and complete the project within forty-five (45) working days after equipment has been delivered. REQUIRED BONDS: Awarded Contractor shall be required to submit a Performance Bond in the amount of one hundred percent (100%) of the agreement, as surety condition for the full, complete and faithful performance of the agreement. In addition, Awarded Contractor shall be required to furnish a Labor and Materials Bond in the amount of one hundred percent (100%) of the agreement if subcontractors are proposed to be used to complete this project. LICENSE REQUIREMENTS: No bid will be accepted from a Contractor who is not duly licensed in accordance with the provisions of Chapter 9, Division III of the State of California Business and Professions Code and has a current Class D-34 Contractor's license (minimum). See Section III for additional Department of Industrial Relations Requirements applicable to this project. The City of Visalia does not provide an Engineer's Estimate, however the total approved budget for this project is approximately $200,000 which is an estimate of the total project delivery costs. *The right is reserved by the City of Visalia to reject any or all proposals, to waive any irregularities or informalities not affected by law, to evaluate the proposals submitted and to award the contract according to the proposal which best serves the interests of said City .
Final Planning
Playgrounds / Parks / Athletic Fields
$200,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 25, 2024
May 27, 2024
1000 S Pinkham St, Visalia, CA
Related To This Project
Visalia, CA
Bid Date: Jan 25 2024
Visalia, CA
--
Visalia, CA
Bid Date: Feb 01 2024
Visalia, CA
Bid Date: Feb 01 2024
Visalia, CA
--
Visalia, CA
Bid Date: Feb 01 2024
Visalia, CA
Bid Date: Jan 31 2024
Visalia, CA
--
Visalia, CA
Bid Date: Feb 08 2024
Visalia, CA
Bid Date: Dec 13 2023
Visalia, CA
--
Visalia, CA
Bid Date: Jan 11 2024
Visalia, CA
Bid Date: Jul 30 2020
Visalia, CA
Bid Date: Nov 01 2021
Visalia, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.