BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Boulder, Colorado. Completed plans call for site work for a water / sewer project.

The work of this section consists of temporary measures for the control of erosion, sedimentation and other pollutants during construction. Work includes installation of such measures, maintenance during the contract period to assure proper function, and removal of temporary measures in coordination with installation of permanent erosion control measures. Reference Number 0000337591 Job Location: City of Boulder 63rd Street The project Work to be performed under this contract is located both within the limits of the City of Boulder (City) and outside of the limits of the City of Boulder, all within Boulder County, CO. The project Work is located along 63rd Street from approximately State Highway (SH) 119 at the north end to approximately Jay Road on the south end, generally in the east/northeast portion of the City of Boulder's (City) water service area. The site of the Work is at the general location as depicted on the Drawings (Project Vicinity Map). The Work consists of the construction of approximately 8,160 feet of 30-inch diameter treated water transmission pipeline. The 30-inch diameter pipeline will be constructed utilizing welded steel pipe and fittings. Pipeline construction will include the trenchless installation steel casing pipe at one crossing location of the Boulder & Left Hand Ditch box culvert, the Boulder White Rock Ditch box culvert, and a pedestrian underpass box culvert Question Acceptance Deadline 01/19/2024 05:00 PM MT Questions are submitted online No, Project Manager Daniel Kvasnicka City of Boulder Public Works Utilities Department Phone: 303-441-3201 Email: kvasnickad@bouldercolorado.gov Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % The proposal guaranty shall be a certified check, cashiers check, or bid bond in the amount of 5 percent of the Contractor's total bid. The lowest responsible and best bid shall be accepted; provided, however, that the city, acting through its duly authorized representatives, shall have the right to reject any and all proposals and waive any informality or irregularity contained in said proposal.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

105 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
67
Bidding Soon
904
All Active Projects
394
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

March 8, 2024

img_map_placeholder

63rd St, Boulder, CO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.