EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 6, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Bethlehem, Pennsylvania. Completed plans call for the renovation of a educational facility.

The Bethlehem Area School District is soliciting SEPARATE sealed bids for the following individual Projects in the form of SINGLE prime lump sum contracts. Freedom High School Boiler & Pump Replacement Liberty High School Klein Center Boiler & Pump Replacement Question Deadline 01/26/2024 All questions must be submitted in writing as follows. Phone calls are not permitted. All questions must be sent to: Bill Niswender (wan@dhuy.com) D'Huy Engineering, Inc. questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five (5) days prior to the date for opening of Bids may not be answered. The entire Work shall be completed in compliance with the Project phasing and milestones indicated on the plans. Any deviations from these requirements shall be subject to the approval of the Engineer. The Owner reserves the right to enforce liquidated damages for contractor's non-compliance with any of the phasing, milestone and substantial completion dates. B. Construction work shall be performed in a sequence to ensure that all building systems are systematically installed in an efficient manner. C. Contractor shall clean and turn over the areas in a sequence for the Owner's use. D. If the Notice to Proceed or a required permit or approval from an approval agency that is required for start of Work is delayed for any reason, all subsequent Phased Completion Dates and Milestone Completion Dates will be adjusted by the exact same number of days. The Contractor is not entitled to damages for delay of any type on this contract. Contractor agrees that an extension of time is the only recourse as a result of any delays that are beyond the Contractor's control. E. If applicable to the project, all Work must be completed in accordance with the Phasing Plans, the Project NPDES permit requirements, the approved project schedule and in a sequence approved by the Engineer and Owner. Each Contractor will be required to be a co-permittee on the Owner's NPDES permit and shall submit the appropriate application forms to the appropriate County Conservation District

Award

Educational

$1,090,000.00

Public - City

Renovation

19

12

18

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
239
Bidding Soon
3,798
All Active Projects
1,830
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

June 14, 2024

img_map_placeholder

Multiple Locations, Bethlehem, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Freedom High School Boiler & Pump Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.