EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Proposed Water Distribution, Sanitary Sewer, Storm Sewer and Paving Systems Project Description: This project will consist of the construction of water lines, sanitary sewer, storm sewer lines and pavement improvements per plans and specifications. Further information regarding scope of work is described in the unit price schedule, as well as the project drawings. Refer to bid folder for project drawings. Contractor shall coordinate work with Project Engineer which is Benchmark Engineering Corp. Contact Mr. Sam Shelton (office) at sshelton@benchmarkengr.net or Mr. Mark Shurden (field observation) at mshurden@benchmarkengr.net. Contractor shall be responsible for keeping streets clean at all times. Any spills or cleanups shall be performed by the contractor at the contractor's expense. Contractor shall be responsible for providing a construction schedule prior to starting construction. Contractor shall refer to SIB portion of the construction manual for additional instructions. Contractor shall fill in list of sub-contractors' portion of the bid. Location: The Project is located in Harris County Municipal Utility District No. 588, West of Kickapoo Road, and North of Waller Spring Creek Road, in Harris County.

Post-Bid

Water / Sewer

$855,000.00

Public - County

Paving, Site Work

1

10

142

5

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding, Sodding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
69
Bidding Soon
2,316
All Active Projects
986
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construction of Proposed Water Distribution, Sanitary Sewer, Storm Sewer and Paving Systems serving Oakberry Sec. 1 & Offsite Waterline and Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.