Demolition, site work, paving, new construction and renovation of a mixed-use development in Jacksonville, Florida. Completed plans call for the demolition of a military facility; for the construction of a military facility; for the renovation of a military facility; for site work for a transportation facility; and water / sewer project.

***Post Q&A set 06 for Questons and Answers Clarifications, no other changes at this time and amended "E" drawing sets to follow. ***Bid opening been adjusted in SAM to 25 April, at 1030 am, pending Amendment to follow Wed or Thurs this week. ***There was no amendment 004 posted yet, the previous "Q&A set 05" was posted in error (it's part of Q&A 04). There will be a forthcomming ammendment next week to extend the bid opening a week, we had some clarification questions that will be posted once the AE responds along with the Amendment 004 bid extention. Please Check reqularly for updates. ***As a reminder, Contractors wishing to attend the Bid Opening are required to submit a new 125FW Form 2 -5 days prior to base entry for a US citizen and 22 days prior for a foreign national. Contractors must use the current 125FW Form 2 Titled Form 2 Fillable (Aug 2023) - CAO 01MAR2024. ***Amendment 003, is to add adeendum to Specs and Drawings based on Q&A response from A&E, last set of Q&A set 04 and 05, no other changes at this time. ***Post Q&A set 03 for Questons and Answers, no other changes*** ***Amendment 002, IS to extend the Bid opening date to 18 April, at 1030EST, this DOES NOT extend the RFI date and 28 March at EOD is last day to accept Q-As, if any questions subitted after that time must be justified by an impact if not responded too. There are additional Q-As that will be posted along with A-E addendum darwing's this week. ***Attaching Pre-Bid Slides, Pre-Bid sign in and Pre-Bid Minutes from 20 March meeting, no other chnages*** ***Post Q&A set 02 for Questons and Answers, there will be revised drawings coming from AE per Q2&5, no other changes*** ***Post Q&A set 01 for Questons and Answers, no other changes*** ***Updated Base Access form revised 1Mar24 added to attachements*** ***Amendment 001, is to change bid aceptance from 60 days to 100 Days, Also attaching Revised Drawings and Spec's from A&E dated 04 March 2024. No other changes.*** Project # / Title: LSGA212001, F-35 Repair Hangar Bldg. B1001 You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W50S6Y-24-B-0002 entitled F-35 Repair Maintenance Hangar B1001, Project Number LSGA212001, at 125th FW JIA, 14300 Fang Drive, B10001, JAX, FL. This action is being solicitated for Small Business Set Aside. The North American Industry Classification (NAICS) Code is 236220 and the Size Standard for Small Business is $45M. Project Magnitude is betw een $10M to $20M. Failure to submit an offer on all items shall result in rejection of the bid. Solicitation and all inf ormation, notices, amendments for this solicitation w ill be posted at https://sam.gov Funds are not presently available for this acquisition. The Government anticipates funds w ill become available prior to aw ard as this action has been identified on the National Guard priority list. Aw ard w ill be made to the responsible bidder w hose bid conf orms to the invitation for bids and is most advantageous to the Government considering only price and price related factors. No contract aw ard w ill be made until appropriated funds are made available. The project site is located at the 125th Fighter Wing (FW) Jacksonville International Airport (JIA), 14300 Fang Drive, Maintenance Hangar Bldg. 1001 (B1001), Jacksonville (JAX), Florida (FL). The Maintenance Hangar at B1001 requires repairs and renovations in order to enable the F-35 Fighter Mission. The work includes repair and full renovation of the ground floor spaces, including demolition, new interior construction and finishes, HVAC, plumbing, electrical, lighting , grounding, fire protection, telecommunication, and access control/security systems. The estimated Period of Performance (PoP) is 540 Calendar Days after Notice to Proceed. ***Amendment 004, is to add adendum to R3 E set Drawings based on Q&A response from A&E, All Q&A sets are incorporated by reference and last WD prior to closing is added, no other changes at this time. ***Post Q&A set 06 for Questons and Answers Clarifications, no other changes at this time and amended "E" drawing sets to follow. ***Bid opening been adjusted in SAM to 25 April, at 1030 am, pending Amendment to follow Wed or Thurs this week. ***There was no amendment 004 posted yet, the previous "Q&A set 05" was posted in error (it's part of Q&A 04). There will be a forthcomming ammendment next week to extend the bid opening a week, we had some clarification questions that will be posted once the AE responds along with the Amendment 004 bid extention. Please Check reqularly for updates. ***As a reminder, Contractors wishing to attend the Bid Opening are required to submit a new 125FW Form 2 -5 days prior to base entry for a US citizen and 22 days prior for a foreign national. Contractors must use the current 125FW Form 2 Titled Form 2 Fillable (Aug 2023) - CAO 01MAR2024. ***Amendment 003, is to add adeendum to Specs and Drawings based on Q&A response from A&E, last set of Q&A set 04 and 05, no other changes at this time. ***Post Q&A set 03 for Questons and Answers, no other changes*** ***Amendment 002, IS to extend the Bid opening date to 18 April, at 1030EST, this DOES NOT extend the RFI date and 28 March at EOD is last day to accept Q-As, if any questions subitted after that time must be justified by an impact if not responded too. There are additional Q-As that will be posted along with A-E addendum darwing's this week. ***Attaching Pre-Bid Slides, Pre-Bid sign in and Pre-Bid Minutes from 20 March meeting, no other chnages*** ***Post Q&A set 02 for Questons and Answers, there will be revised drawings coming from AE per Q2&5, no other changes*** ***Post Q&A set 01 for Questons and Answers, no other changes*** ***Updated Base Access form revised 1Mar24 added to attachements*** ***Amendment 001, is to change bid aceptance from 60 days to 100 Days, Also attaching Revised Drawings and Spec's from A&E dated 04 March 2024. No other changes.*** Project # / Title: LSGA212001, F-35 Repair Hangar Bldg. B1001 You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W50S6Y-24-B-0002 entitled F-35 Repair Maintenance Hangar B1001, Project Number LSGA212001, at 125th FW JIA, 14300 Fang Drive, B10001, JAX, FL. This action is being solicitated for Small Business Set Aside. The North American Industry Classification (NAICS) Code is 236220 and the Size Standard for Small Business is $45M. Project Magnitude is betw een $10M to $20M. Failure to submit an offer on all items shall result in rejection of the bid. Solicitation and all inf ormation, notices, amendments for this solicitation w ill be posted at https://sam.gov Funds are not presently available for this acquisition. The Government anticipates funds w ill become available prior to aw ard as this action has been identified on the National Guard priority list. Aw ard w ill be made to the responsible bidder w hose bid conf orms to the invitation for bids and is most advantageous to the Government considering only price and price related factors. No contract aw ard w ill be made until appropriated funds are made available. The project site is located at the 125th Fighter Wing (FW) Jacksonville International Airport (JIA), 14300 Fang Drive, Maintenance Hangar Bldg. 1001 (B1001), Jacksonville (JAX), Florida (FL). The Maintenance Hangar at B1001 requires repairs and renovations in order to enable the F-35 Fighter Mission. The work includes repair and full renovation of the ground floor spaces, including demolition, new interior construction and finishes, HVAC, plumbing, electrical, lighting , grounding, fire protection, telecommunication, and access control/security systems. The estimated Period of Performance (PoP) is 540 Calendar Days after Notice to Proceed. There are no Option line, all Lines must be priced There are no Option line, all Lines must be priced *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Military

$14,161,914.00

Public - Federal

Demolition, New Construction, Paving, Renovation, Site Work

221

39

305

9

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
33
Bidding Soon
638
All Active Projects
275
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

June 17, 2024

img_map_placeholder

14300 Fang Dr, Jacksonville, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.