Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 18, 2023 at 7:00 PM

Updated January 29, 2024

Site work and paving for a road / highway in Fresno, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Services will include preparation of necessary plans, specifications, estimates and conducting necessary utility coordination for this project . In general: Participate in coordination meetings with City staff, Caltrans, impacted utility companies, and stakeholders as needed. Prepare and maintain design delivery schedule in order to submit construction PS&E package to Caltrans by February 2025 for RFA construction funding approval. Coordinate design with current and proposed projects in the vicinity. Prepare and maintain design schedule. Conduct site investigations as needed to produce accurate design documents. Prepare and maintain design scope, budget, quality, and provide a monthly project status report. Prepare utility notification letters and/or applicable documents to utilities and agencies as needed to begin utility relocations and/or Civil work. Take the lead on utility relocations including preparing and submitting necessary documents to different agencies. Preparation of Utility Communication Log to be completed and updated with every submittal, or upon request of City Project Management Team. Process City provided topographic survey information. Identify if additional topographic survey requirements are needed for the City Survey team to perform survey. Prepare and provide pothole exhibit based on utility research and engineers' recommendation showing potential utility conflicts. Provide geotechnical testing and report as required. Provide evaluation of current pavement conditions, recommendation of pavement treatment based on geotechnical study (i.e., full-section reconstruction, grind and overlay, Full-Depth Reclamation (FDR), and innovative pavement methods). Project Duration April 2024 to September 2026 Pre-Bid Meeting No Online Q&A No Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$800,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
51
Bidding Soon
964
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2024

Project location map

E St, Fresno, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed