EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 19, 2024 at 8:00 PM

Updated October 1, 2024

Site work, paving and new construction of a residential development in Jay, Oklahoma. Completed plans call for the construction of a residential development; for site work for a residential development; and for paving for a residential development.

As of March 19, 2024, a construction manager has been confirmed as awarded. Bid packages have been released. The objective of the RFP is to receive cost proposal for the oversight and construction of new housing subdivision in Jay, Oklahoma. The construction project for the Housing Authority of the Cherokee Nation (HACN) consists of a fully developed 21 home lot subdivision with 10 new construction homes three (3) single home type 1, two (2) single home type 2, two (2) single handicap accessible home type 3, and three (3) single home type 4. Sod lots with completed houses, detention pond, strip between curb and sidewalk and 3' strip along edge of all other site paving. Continue curb and gutter along lots where homes are not being constructed. The House Plans and Site Plan issued by the Architect/Engineer are included for reference. The HACN is requesting bids to be based on these plans, but upon negotiations, the plans may be altered at the request of the HACN. The HACN is requesting that the CM firm provide an estimated cost per new construction home, site development cost, and similar project history and experience. The estimated cost provided by the CM should be used for establishing CM Fee, General Conditions, Project Requirements, and Cost of Work estimates based on a 12- month period. Complete construction documents include the plans, specifications, structural, mechanical, electrical, and plumbing. Any and all such interpretations and any supplemental instructions will be in the form of written addenda, will be provided no later than Wednesday, January 10, 2024, by 5:00 p.m. CT. No interpretation of the RFP requirements will be made to any interested party orally. Failure to receive any issued addendum or interpretation shall not relieve responding party from any obligation contained in RFP document A performance bond on the part of the Construction Manager for 100 percent (100%) of the contract price. A "performance bond" is one executed in connection with a contract to secure fulfillment of all the Construction Manager's obligations under such contract. b) A payment bond on the part of the Construction Manager for 100 percent (100%) of the contract price. A "payment" bond is one executed in connection with a contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided for in the contract. c) A maintenance bond may be required by the HACN based on the project. The HACN may request the Construction Manager provide the percentage/fees for a maintenance bond for a specific project. A "maintenance" bond is one executed to make sure the Construction Manager remedies any defects, or the owner is compensated for any defects that may have occurred throughout the construction project. Firms should carefully review this RFP. Firms shall put these comments and/or questions in writing and submit them to the HACN (Attn: Tonya Lockwood, Contracts Manager) no later than Friday, January 05, 2024, by 5:00 p.m. CT by email to tonya.lockwood@hacn.org. The RFP Evaluation Committee reserves the right to waive minor irregularities. This right is at the sole discretion of the proposal evaluation committee. The HACN reserves the right to determine a proposal acceptable in terms of meeting RFP requirements. The HACN reserves the right to accept or reject any and all proposals received and to negotiate with the responding firm regarding the terms of their proposals or parts thereof. The HACN reserves the right to award any future contracts in the best interests of the HACN. The HACN is requesting that the CM firm provide an estimated cost per new construction home, site development cost, and similar project history and experience

Award

Residential Subdivision

$3,000,000.00

Public - Federal

New Construction, Paving, Site Work

3

25

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Underlayment, Shop-Fabricated Structural Wood, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Membrane Roofing, Roll Roofing, Flashing and Sheet Metal, Flexible Flashing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Central Heating Equipment, Fuel-Fired Heaters, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
73
Bidding Soon
856
All Active Projects
429
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Jay, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP CM At Risk-Services - Ganohili Addition

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.