BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Starkville, Mississippi. Completed plans call for the renovation of a educational facility.

Removal and disposal of existing flooring system asbestos containing material, finish repair and replacement on all floors of Hathorn Hall, and all associated work as indicated in the Documents. Questions should be directed to the project Professional with a copy to MSU Office of Procurement and Contracts. Should a Bidder find discrepancies in or omissions from, the Drawings or Project Manual, or be in doubt as to their meaning, the Bidder should immediately notify the Professional and Office of Procurement and Contracts. The Office of Procurement and Contracts will send written instruction(s) or interpretation(s) to all known holders of the documents and copy the Professional. Neither the Owner, the Professional, nor the Office of Procurement and Contracts will be responsible for any oral instruction or interpretation. Related Work Specified Elsewhere: Sections of Specifications as listed under Schedule of Allowances. B. Allowances for Products: 1. Purchase products under each allowance as directed by the Professional. 2. Amount of each allowance includes: a. Net cost of product. b. Delivery and unloading at site. c. Applicable taxes. 3. In addition to amounts of allowances, include in bid, for inclusion in Contract sum, Contractor's costs for: a. Handling at site, including uncrating and storage. b. Protection from elements and damage. c. Labor, installation and finishing. d. Other expenses required to complete installation. e. Overhead and profit. C. Selection of Products: 1. Architect's Duties: Consult with Contractor in consideration of products and Suppliers; make selections, designate products to be used; and notify Contractor in writing. 2. Contractor's Duties: Assist Professional in determining qualified Suppliers; obtain proposals from Suppliers when requested by the Professional; and make appropriate recommendations for consideration of the Professional. Upon notification of selection, enter into Purchase Agreement with designated Supplier. D. Delivery: The Contractor is responsible for arranging all delivery and unloading and should promptly inspect products for damage or defects and submit claims for transportation damage. E. Installation: Comply with requirements of referenced specification section. F. Adjustment of Costs: Should actual purchase cost be more, or less, than the specified allowance amount, the Contract Sum will be adjusted by Change Order equal to the amount of the difference.

Post-Bid

Educational

$1,052,000.00

Public - State/Provincial

Renovation

11

17

4

11

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
26
Bidding Soon
267
All Active Projects
121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

April 1, 2024

img_map_placeholder

76 Magruder St, Starkville, MS

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.