Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Estacada, Oregon. Completed plans call for the renovation of a educational facility.
DIRECT ALL INQUIRIES VIA Email TO: Christina Irish, Director of Finance irishc@estacada.k12.or.us and Mike Waer, Executive Director of Operations waerm@estacada.k12.or.us The Estacada School District is soliciting proposals to establish a contract through fair and competitive negotiations for installing mini-split units in designated classrooms at the Estacada Middle School. The Estacada School District will be installing mini-split units in designated classrooms in the District. This is part of a district-wide initiative to improve the indoor air quality in the classrooms. BACKGROUND and SPECIFICATIONS: BACKGROUND The purpose of this Request for Proposal (RFP) is to solicit proposals to establish a contract through fair and competitive negotiations for installing multiple mini-split units in designated classrooms in the District. Attend the scheduled walkthrough on the date/time listed above. The contractor must submit a proposal for the entire project, to include the following scope of work: Installation of split units in each designated classroom, per specifications Installation of all associated electrical components: wiring and conduit Installation of additional conduit, per District designation, for future placement of split units (reviewed at the site visit meeting) The contractor must provide the costing in the proposal as follows: Cost of full project, itemized by classroom. Pricing must include electrical needs, applicable subcontractor costs, and applicable permitting fees (by contractor or subcontractors) Pricing pricing must not exceed $300,000.00 The District reserves the right to select one or all proposals as part of the evaluation of the RFP. In the event projects are not fully funded, the Estacada School District reserves the right to modify the scope of the project or cancel the project. The contractor must include with the bid, an executive summary of services including warranties and support. The contractor will be responsible for securing sub-contractors for any applicable work, which must be reflected in the RFP (costs and services). Contractor will be responsible for all electrical load calculations to determine any additional power needs for this project. The Estacada School District has conducted a site evaluation to determine the highest priority of classrooms. A copy of this evaluation will be provided to the Contractor at the on-site walkthrough. AWARD OF CONTRACT: A. The contract(s) will be tentatively awarded by letter to the Respondent(s) who in the District's judgment is best suited to provide the requested goods and services using the evaluation described in this RFP. B. The District may defer awarding Contract for the project until after the Board determines whether the District has sufficient funds for that Project. The District will notify Respondents if the award of the Contract will be deferred under this subsection.
Award
Educational
$905,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2024
March 4, 2024
500 NE Main St, Estacada, OR
Related To This Project
Estacada, OR
Bid Date: Mar 21 2019
Estacada, OR
Bid Date: Feb 13 2019
Estacada, OR
Bid Date: Mar 20 2024
Estacada, OR
Bid Date: May 16 2024
Estacada, OR
Bid Date: Jun 04 2024
Estacada, OR
Bid Date: Jul 18 2024
Estacada, OR
Bid Date: Jul 16 2024
Estacada, OR
Bid Date: Aug 06 2024
Estacada, OR
--
Estacada, OR
Bid Date: Oct 24 2023
Estacada, OR
Bid Date: Apr 14 2021
Estacada, OR
Bid Date: Mar 19 2021
Estacada, OR
Bid Date: Feb 16 2022
Estacada, OR
Bid Date: Mar 04 2021
Estacada, OR
Bid Date: Aug 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.