BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Peculiar, Missouri. Completed plans call for site work for a water / sewer project.

The Project consists of adding water mains at Summer skill Dr and Peculiar Dr, along Main north of 218th Street, and adding check valves as shown in the plans along with all appurtenant work complete and ready for service, including temporary facilities, and erosion control as required and in conformance with the Contract Documents. Pre-Bid Meeting Info: A pre-bid meeting will not be held for this project. No bid will be considered unless sealed and accompanied by a bidder's bond naming City of Peculiar as obligee, or a certified check payable to City of Peculiar, equal to at least (5%) of the amount of the bid, which shall be returned or forfeited as set forth in the Information for Bidders. The City of Peculiar reserves the right to retain the deposits of the two lowest bids for a period not to exceed sixty (60) days after the date and time set for the opening of bids. No bids may be withdrawn for a period of sixty (60) days after the date and time set for the opening of bids. The Issuing Office will transmit the Bidding Documents and the date the Work is to be commenced within thirty calendar days after the Notice to Proceed is issued. Substantial Time of Completion including testing and post inspection and ready for use by Owner is to be 120 Calendar Days from the date of Notice to Proceed, and the Final Completion date is to be 150 Calendar Days from the date of Notice to Proceed. Prevailing Wages. Minimum wage rates for this contract shall be prevailing wage rates as determined by the Industrial Commission of Missouri. The wage rates can be downloaded from the state and are considered as a part of this Invitation to Bid. ENROLLMENT IN FEDERAL WORK AUTHORIZATION PROGRAM. Bidders are informed that pursuant to Section 285.530 RSMo as a condition of the award of any contract in excess of five thousand dollars ($5000), the successful bidder shall, by sworn affidavit and provision of documentation, affirm its enrollment and documentation, affirm its enrollment and participation in a federal work authorization program with respect to the employees working in connection to the contracted services. Successful bidders shall also sign an affidavit affirming that it does not knowingly employ any person who is an unauthorized alien in connection to the contracted services. SAFETY TRAINING. Bidders are informed that the project is subject to the requirements of Section 292.675 RSMo, which requires all contractors or subcontractors doing work on the project to provide, and require its on-site employees to complete, a ten (10) hour course in construction safety and health approved by the Occupational Safety and Health Administration (OSHA) or a similar program approved by the Missouri Department of Labor and Industrial Relations that is at least as stringent as an approved OSHA program. If on-site employees had not previously completed such training, the training must be completed within sixty (60) days of the date, work on the project commences. On-site employees found on the worksite without documentation of the required training shall have twenty (20) days to produce such documentation. MISSOURI DEPARTMENT OF LABOR NOTICE. Only Missouri laborers and laborers from nonrestrictive states are allowed by law to be employed on Missouri's public works projects when the unemployment rate exceeds 5% for two consecutive months. (See Sections 290.550 through 290.580 RSMO.) The unemployment rate has NOT exceeded 5% for the past two months. Therefore, this statute is NOT in effect and will remain in effect as long as this notice is posted by the Missouri Department of Labor. For questions call (573) 751-3403 Extension 0, view the Frequently Asked Questions at Online at Electronically. Nonrestrictive states are as follows: Arkansas, Colorado, Georgia, Hawaii, Indiana, Kansas, Kentucky, Louisiana, Nebraska, New Hampshire, Maryland, Michigan, Minnesota, New Mexico, New Jersey, New York, North Carolina, Ohio, Oregon, Rhode Island, South Carolina, Tennessee, Texas, Utah, Vermont, Virginia, Washington, West Virginia and Wisconsin. The Owner reserves the right to reject any or all bids. The Owner further reserves the right to waive any irregularities in any or all bids and reserves the right to determine which is the most responsive, responsible Bidder and to reject or approve the bonds. MBE and WBE bidders are encouraged to bid. City of Peculiar is an Equal Opportunity Employer.

Award

Water / Sewer

$226,190.00

Public - City

Site Work

12

14

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
29
Bidding Soon
720
All Active Projects
308
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2024

March 4, 2024

img_map_placeholder

Multiple Locations, Peculiar, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.