Site work for a water / sewer project in Honolulu, Hawaii. Completed plans call for site work for a water / sewer project.

Repair Fencing at Pier 53, Honolulu Harbor. The work to be done on this project includes furnishing all labor, materials and equipment necessary to perform the removal and replacement of the existing chainlink fence at Pier 53, Honolulu Harbor. The work includes removal of existing posts, chainlink mesh, barbed wire, and the installation of new posts, footings as necessary, chainlink mesh, barbed wire, concrete wall restoration where the chainlink posts embed into an existing concrete wall, and all incidentals. The contractor shall not be allowed to encroach into the Coast Guard property to accomplish the work. Bidders are advised to examine the existing conditions at the proposed project site to familiarize themselves with the nature and extent of work involved and working conditions. Appointments may be made with the Harbors Division Project Engineer for clarification of the work involved or definition of the limits of the work. The fence to be replaced on this project provides security for the storage yards at Piers 51-53. Therefore, the contractor must maintain the same level of security for these particular areas for the entire duration of this project. The existing security perimeter shall be maintained with new, temporary or interim fencing at all times. At no time will a portion of the pier be left unprotected by either fencing or an approved security guard. Payment for temporary fencing and security personnel shall not be made separately but shall be considered incidental to the payment items described in Article X of these Specifications. The scope of work for this project consists of removal and replacement of the existing 8-foot and 16-foot tall chain link fence with 3-strand barbed wire at Pier 53, Honolulu Harbor. The estimated cost of construction is between $400,000.00 and $490,000.00. To be eligible for award, bidders must possess a valid State of Hawaii General Engineering Contractor's "A" license at the time of bidding. For additional information, contact Mr. Gregg Hirokawa, Harbors Project Manager, by phone at (808) 587-1985, or by email at gregg.hirokawa@hawaii.gov. The State reserves the right to reject any or all proposals and to waive any defects in said proposals in the best interest of the public. A certificate of deposit; credit union share certificate; or cashier's, treasurer's, teller's, or official check drawn by or a certified check accepted by a bank, savings institution, or credit union insured by the Federal Deposit Insurance Corporation (FDIC) or the National Credit Union Administration (NCUA) and payable at sight or unconditionally assigned to the Department. These instruments may be utilized only to a maximum of one hundred thousand dollars ($100,000.00). If the required amount totals over one hundred thousand dollars ($100,000.00), more than one instrument not exceeding one hundred thousand dollars ($100,000.00) each and issued by different financial institutions shall be accepted. Unless directed otherwise in the invitation for bids, each bid shall be accompanied by bid security which is intended to protect the Department against the failure or refusal of a bidder to execute the contract for the work bid or to supply the required performance and payment bonds. Bid security shall be in an amount equal to at least five percent of the base bid and additive alternates. Question Deadline 01/03/2024 at 2:00 PM HT All Request for Information (RFI) questions and substitution requests shall be submitted RFI questions received after the stated deadline will not be addressed. Verbal RFI questions will not receive a response. All responses to RFI questions shall be issued by formal addendum and posted in HIePRO. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The scope of work for this project consists of removal and replacement of the existing 8-foot and 16-foot tall chain link fence with 3-strand barbed wire at Pier 53, Honolulu Harbor. A. Mobilization and demobilization. B. Provide a Best Management Practices (BMP) Plan. C. Perform chainlink fence improvements, including the following: 1. Demolish existing fence posts, chainlink mesh, and barbed wire. 2. Installation of new fence posts, footings as necessary, chainlink mesh, and barbed wire. 3. Restoration of existing concrete wall where new fence posts embed into existing concrete wall.

Bid Results

Water / Sewer

$911,753.00

Public - State/Provincial

Site Work

9

10

2

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
2
Bidding Soon
87
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

April 1, 2024

img_map_placeholder

791 N Nimitz Hwy, Honolulu, HI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.