Site work and paving for a sidewalk / parking lot in Saint Paul, Minnesota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
City of Saint Paul Parks on behalf of River Center is looking for bids on 2024 RIVERCENTRE RAMP REPAIRS Project. This is for repairs to the River Centre Parking Ramp that are mostly concrete repairs to the slabs, columns, and beams. Q And A Close: 01/05/2024 02:00:00 PM The Work consists concrete repairs and preventative maintenance Description of Bids - The following description of Bid Items is informational only. Bid forms are available from the Owner. B. Bid Item Unit Price Description - The following units of work shall be priced and extended out to arrive at the cost of the Contract. The unit prices shall contain the cost of labor, materials, sales tax, insurance of all kinds, building permits, bonds, tools and equipment costs, power, water, profit, overhead, and any other cost that will be associated with the Project, including safety protection, barricades, and personnel safety. The Engineer will measure all pay items and shall clarify that they are correct. The Contractor shall be paid only for the pay items listed. If units are added to this work by way of additional change orders or problems found during construction, they shall be paid for at the unit price. If the sum of the measured pay items is less than the engineer's quantity, the Contractor shall be paid only for the measured pay items. 1. General Conditions and Mobilization - Item shall consist of all preparatory work and operations, including, but not limited to, shop drawings, necessary movement of personnel, equipment, supplies and incidentals to the project site; for the establishment of all Contractor offices and buildings or other facilities necessary for work on the Project; and for all other work and the operations which must be performed, for costs incurred, before beginning work on the various items of the Scope of Work. 2. Ped Walkway Partial Depth Concrete Repair, Floor Slab - Item shall include removal of loose and delaminated concrete for partial depth of slab, surface preparation, including treatment with corrosion inhibitor, and patching with polymer modified mortar. 3. Ped Walkway Partial Depth Vertical/Overhead - Item shall include removal of loose and delaminated concrete for partial depth of slab, surface preparation, including treatment with corrosion inhibitor, and patching with polymer modified mortar. 4. Ped Walkway Full Depth Concrete Repair, Floor Slab- Item shall include removal of loose and delaminated concrete for full depth of slab, shoring, surface preparation, including treatment with corrosion inhibitor and patching with polymer modified mortar. 5. Ped Walkway Partial Depth Vertical/Overhead Under Plaza Higher Ceiling- Item shall include removal of loose and delaminated concrete for partial depth of slab, surface preparation, including treatment with corrosion inhibitor, and patching with polymer modified mortar.
Bid Results
Sidewalks / Parking Lot
$1,083,593.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 17, 2024
February 19, 2024
175 W Kellogg Blvd, Saint Paul, MN
Related To This Project
Saint Paul, MN
Bid Date: Jan 17 2024
Saint Paul, MN
Bid Date: Dec 19 2023
Saint Paul, MN
Bid Date: Dec 19 2023
Saint Paul, MN
Bid Date: Dec 19 2023
Saint Paul, MN
Bid Date: Dec 19 2023
Saint Paul, MN
Bid Date: Jan 16 2024
Saint Paul, MN
Bid Date: Feb 08 2024
Saint Paul, MN
Bid Date: Jan 05 2024
Saint Paul, MN
Bid Date: Jan 16 2024
Saint Paul, MN
Bid Date: Feb 13 2024
Saint Paul, MN
Bid Date: Jan 05 2024
Saint Paul, MN
Bid Date: Jan 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.