Site work and paving for a sidewalk / parking lot in Danville, Virginia. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The last day for questions has been extended to 12:00 P.M. Friday March 1, 2024. Bonds: 5% Bid bond; 100% performance and payment bonds. Time of Completion: All work must be completed within 300 days from the Notice to Proceed. Liquidated Damages: $350 dollars per calendar day. General work description: Construct sidewalk, curb & gutter, and concrete driveway entrances. Detailed work description: The project consists of regular excavation and grading to construct sidewalk along both sides of Arnett Boulevard between Third Avenue W/Wendell Scott Drive and Guilford Street (approximately 1900 feet). Curb & gutter and concrete driveway entrances shall be replaced at all locations. Arnett Boulevard shall be milled, repaved, and striped as to allow the addition of a new four (4) foot bike lane in both directions. New RRFB pedestrian push-button beacons and crosswalks are to be installed at two (2) intersections: Ingram Street and Guilford Street. An "Advance Warning Sign shall also be installed prior to Wendell Scott Drive. The City of Danville (the City) will receive sealed bids for construction of ARNETT BOULEVARD IMPROVEMENTS FROM: EDEN PLACE TO: GUILFORD STREET Question sent to Carol Henley, Director of Purchasing (434) 799-6528 purchasing@danvilleva.gov City Project Representative: Karen Black Phone: (434) 799-5019 Email (preferred): blackka@danvilleva.gov The project consists of regular excavation and grading to construct sidewalk along both sides of Arnett Boulevard between Third Avenue W/Wendell Scott Drive and Guilford Street (approximately 1900 feet). Curb & gutter and concrete driveway entrances shall be replaced at all locations. Arnett Boulevard shall be milled, repaved, and striped as to allow the addition of a new four (4) foot bike lane in both directions. New RRFB pedestrian push-button beacons and crosswalks are to be installed at two (2) intersections: Ingram Street and Guilford Street. An "Advance Warning Sign" shall also be installed prior to Wendell Scott Drive. Females- 6.9% Minorities - 12%

Award

Sidewalks / Parking Lot

$1,329,740.00

Public - City

Paving, Site Work

6

6

22

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
45
Bidding Soon
1,218
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

June 24, 2024

img_map_placeholder

Arnett Blvd, Danville, VA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.