BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Rochester, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

CR Number: 2104810 This Project consists of the improvements for the Pueblo Nuevo Group, which consists of the following streets: Sullivan Street (N Clinton Avenue to Joseph Avenue) - reconstruction O'Brien Street (West End to Joseph Avenue) - rehabilitation Hoeltzer Street (N Clinton Avenue to Joseph Avenue) - reconstruction Kappel Place (West End to N Clinton Avenue) - milling and resurfacing The scope of work for the reconstruction of Sullivan and Hoeltzer Streets consists of the replacement of the existing pavement sections with a new medium-duty asphalt pavement section; widening and shifting of the Hoeltzer Street pavement from 19.5' to 20'; installation of new stone curb and underdrain pipe; replacement of existing sidewalks and driveway aprons; replacement/adjustment of existing catch basins; adjustment of existing sewer manhole frames and covers; adjustment, relocation or replacement of existing water hydrants, water valves and/or boxes, curb stops and/or boxes; removal of existing trees; planting of new trees; and re-grading and hydro-seeding of all lawn areas disturbed by construction activities. In addition, the installation of water services in conflict with proposed south curb line on Hoetlzer Street. The scope of work for O'Brien Street consists of the widening of the existing pavement from 18' to 22'; milling and resurfacing of the existing pavement; installation of new stone curb and underdrain pipe; replacement of existing sidewalks and driveway aprons; replacement of existing catch basins; adjustment of existing sewer manhole frames and covers; relocation or replacement of existing water hydrants; adjustment or replacement of existing water valves and/or boxes; removal of existing trees; planting of new trees; clearing and grubbing of existing vegetation within and along the public right-of-way; and re-grading and hydro-seeding of all lawn areas disturbed by construction activities. The scope of work for Kappel Place consists of the milling and resurfacing of the existing pavement; closure of the existing unused driveway openings by installing new stone curb and replacing the driveway apron with new sidewalk; reconfiguration of the dead end portion of the street to provide new connecting sidewalk by installing new stone curb and new sidewalk; adjustment of existing sewer manhole frames and covers; adjustment of existing water valve boxes; clearing and grubbing of existing vegetation within and along the public right-of-way; and re-grading and hydro-seeding of all lawn areas disturbed by construction activities. A known NYSDEC superfund site (NYSDEC #828214) exists, within the project limits, at 65 Sullivan Street. Chlorinated volatile organic compounds (VOCs) have been detected in groundwater, and VOCs, semi-volatile organic compounds and metals have been detected in soil at levels that exceed applicable standards, criteria and guidance. The City's street rehabilitation project has the potential to disturb impacted media. Consequently, the City's Division of Environmental Quality (DEQ) requested Terracon Consultants-NY, Inc. (Terracon) analyze borings, adjacent to the site, along Sullivan and O'Brien Street, to characterize soils for exposure risk and/ or future waste profiling and disposal. Two (2) soils samples (B-5 and B-9) were collected on May 18, 2023, and analyzed for Urban Fill parameters including: Volatiles (8260), Semi-volatiles (8270), RCRA Metals (7471), PCBs (6010), Pesticides (8081), Herbicides (8151), pH (9040), Ignitability (1010), and Reactivity (SW846, 7.3). Laboratory results indicate soil contaminants were found to be non-hazardous and below restricted-residential regulatory limits. However, excavated materials are still considered to be regulated under NYSDEC Part 360 and must be managed in accordance with the approved Soil and Groundwater Management Plan. Minority Owned Sub-Contracting Goal: 20% Women Owned Sub-Contracting Goal: 10%

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

97

6

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
104
Bidding Soon
1,656
All Active Projects
661
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 16, 2024

February 16, 2024

September 9, 2024

img_map_placeholder

Multiple Locations, Rochester, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.