Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Bunn, North Carolina. Completed plans call for the renovation of a detention facility.
Franklin Correctional Center Air Conditioning Installation: Base Bid includes the demolition of eight (8) heating and ventilating units in two (2) dormitory buildings and removal of one (1) heating and ventilating unit in the single cell building and replacement with new units, including air conditioning with exterior condensing units, along with associated electrical, controls, fire alarm disconnect/reconnect, and general construction needed. Alternate No. 1 includes the demolition of four (4) heating and ventilating units in one (1) dormitory building and replacement with new units, including air conditioning with exterior condensing units, along with associated electrical, controls, fire alarm disconnect/reconnect, and general construction needed. Work can be completed during normal business hours. The building will be occupied during the construction period. Bids will be received for Single Prime Construction. All proposals shall be lump sum. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 30 days. The owner reserves the right to reject any or all bids and to waive informalities. All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. General contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General contractors submitting bids on this project must have license classification for Unlimited Building License Classification. Document note: The full plan deposit will be returned to those bidders provided all documents are returned in good, usable condition within ten (10) days after the bid date. A link for downloading complete plans and specifications for this project can also be obtained by any bidder that will be submitting a bid to the Owner, by contacting Johnny P. Wood, PE, Project Manager with Dewberry Engineers Inc, Raleigh, NC at jwood@dewberry.com during normal business hours.
Bid Results
Jails / Prisons
$2,128,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 23, 2024
February 22, 2024
5918 NC-39, Bunn, NC
Related To This Project
Bunn, NC
Bid Date: Jan 11 2024
Bunn, NC
Bid Date: Mar 30 2022
Bunn, NC
Bid Date: Mar 08 2022
Bunn, NC
Bid Date: Jan 26 2022
Bunn, NC
Bid Date: Aug 10 2023
Bunn, NC
Bid Date: Feb 28 2023
Bunn, NC
Bid Date: May 09 2023
Bunn, NC
Bid Date: Feb 23 2023
Bunn, NC
Bid Date: May 10 2023
Bunn, NC
Bid Date: Feb 03 2023
Bunn, NC
Bid Date: Jan 20 2023
Bunn, NC
Bid Date: Nov 28 2022
Bunn, NC
Bid Date: Sep 27 2022
Bunn, NC
Bid Date: Sep 12 2022
Bunn, NC
Bid Date: Sep 07 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.