Renovation of a power facility in Poulsbo, Washington. Completed plans call for the renovation of a power facility.
As of February 2, 2024 this project was awarded to Legacy Communications with the awarded amount of $593,173.67. Bids are being asked for provision of all necessary labor, equipment and materials required for the installation of DC power plants including battery strings, rectifiers, equipment racks, and associated equipment at 7 locations within Kitsap County. Work includes electrical and HVAC work including installation of sub panels, transfer switches, lighting, receptacles, and ductless mini-split HVAC heating and cooling systems all as indicated in the plans and specifications . All work performed on this project is subject to state prevailing wage rates. Non-mandatory site meetings will be held; note Introduction to Bidders. The Kitsap PUD is an Equal Opportunity and Affirmative Action Employer. This project is partially funded through Kitsap County with federal funds from the U.S. Treasury ARPA Coronavirus State and Local Fiscal Recovery Fund. Contractor must be licensed, bonded, and insured in Washington State. Contractors are encouraged to commit to local hires for this project. Small, Minority- and Women-owned firms are encouraged to submit bids. A 5% bid guarantee is required in the form of certified or cashier's check, or surety bond. The Contract will be awarded to the qualified bidder submitting the lowest responsible bid. Kitsap PUD reserves the right to reject any or all bids and to waive all informalities in the bidding in accordance with the specifications. Each Bid Proposal shall conform to the requirements of Section 1-02.9 of the Contract Special Provisions. Bids shall be made out on the bid form furnished with the specifications. When submitting a bid, only include the bid form, the bid guarantee, Non-Collusion certificate, Statement of Bidders Qualifications, and the., Certification of Compliance with Wage Payment Statutes, and Subcontractor Lists. Point of contact for questions is Joel Hansen, at jhansen@kpud.org; (360)-509-8982 Contract physically completed within 180 working days. OLD MILL - 4600 Old Mill Rd NE Bainbridge Island, WA 98110 Install Alpha Technologies CXPS-E3 48VDC power plant. o Install two (2) 48V 170AH battery strings with temperature sensors and string battery breakers. o Install Cordex HP CXRF 48-4.6KW rectifiers, rectifier module blanks, LVDB battery breakers and load breakers. o Install twelve (12) Chatsworth 55053-503 equipment racks with 11729-503 double sided cable management and required grounding system. Racks to be spaced with front and rear aisle access with a minimum of 23 inches from walls and a minimum of 28 inches between rack rows. o All racks, ladders, and trays to meet appropriate seismic ratings. o Install 12" overhead cable ladder with individual top plate supports and code required grounding system. o Install six (6) Amphenol 125GMT/NRG125GMT 125A fuse panels. o Evaluate capacity of current electrical service to feed the additional needs of Telecom equipment; contractor will install sub-panels from existing electrical service at each site that meets code requirements. o Install minimum 100A AC sub-panel. The 100-amp service panel shall be Eaton CH breaker panel or equivalent. o Install manual transfer switch with 4 pole circuit breaking mating connector. o Install six (6) 4000 lumen LED ceiling light fixtures evenly spaced in the building with an appropriate light switch at the doorway. o No receptacles are needed at this site. o Install HVAC mini-split ductless system with heating and cooling capabilities; unit will be a 3-ton 36k btu heat pump mini split system with energy star certification. NEWBERRY 8061 NW Newberry Hill Rd Silverdale, WA 98383 o Install Alpha Technologies CXPS-E3 48VDC power plant. o Install two (2) 48V 170AH battery strings with temperature sensors and string battery breakers. o Install Cordex HP CXRF 48-4.6KW rectifiers, rectifier module blanks, LVDB battery breakers and load breakers. o Install twelve (12) Chatsworth 55053-503 equipment racks with 11729-503 double sided cable management and required grounding system. Racks to be spaced with front and rear aisle access with a minimum of 23 inches from walls and a minimum of 28 inches between rack rows. o All racks, ladders, and trays to meet appropriate seismic ratings. o Install 12" overhead cable ladder with individual top plate supports and code required grounding system. o Install six (6) Amphenol 125GMT/NRG125GMT 125A fuse panels. o Evaluate capacity of current electrical service to feed the additional needs of Telecom equipment; contractor will install sub-panels from existing electrical service at each site that meets code requirements. o Install minimum 100A AC sub-panel. The 100-amp service panel shall be Eaton CH breaker panel or equivalent. o Install manual transfer switch with 4 pole circuit breaking mating connector. o Install six (6) 4000 lumen LED ceiling light fixtures evenly spaced in the building with an appropriate light switch at the doorway. o Install eight (8) 20A duplex receptacles with 2 receptacles each evenly spaced on each wall; one circuit per wall. o Install HVAC split system with heating and cooling capabilities; unit will be a 3-ton 36k btu heat pump mini split system with energy star certification. KEYPORT WELL 1 Keyport Saltwater Park WA-308 NE Keyport, WA 98345 o Install Alpha Technologies CXPS-E3 48VDC power plant. o Install two (2) 48V 170AH battery strings with temperature sensors and string battery breakers. o Install Cordex HP CXRF 48-4.6KW rectifiers, rectifier module blanks, LVDB battery breakers and load breakers. o Install three (3) Chatsworth 55053-503 equipment racks with 11729-503 double sided cable management and required grounding system. Racks to be spaced with front and rear aisle access with a minimum of 23 inches from walls and a minimum of 28 inches between rack rows. o All racks, ladders, and trays to meet appropriate seismic ratings. o Install 12" overhead cable ladder with individual top plate supports and code required grounding system. o Install two (2) Amphenol 125GMT/NRG125GMT 125A fuse panels. o Evaluate capacity of current electrical service to feed the additional needs of Telecom equipment; contractor will install sub-panels from existing electrical service at each site that meets code requirements. o Install minimum 100A AC sub-panel. The 100-amp service panel shall be Eaton CH breaker panel or equivalent. o Install manual transfer switch with 4 pole circuit breaking mating connector. o Install three (3) 4000 lumen LED ceiling light fixtures evenly spaced in the building with an appropriate light switch at the doorway. o Install eight (8) 20A duplex receptacles with 2 receptacles each evenly spaced on each wall; one circuit per wall. o Install HVAC split system with heating and cooling capabilities; unit will be a 3-ton 36k btu heat pump mini split system with energy star certification. STATION 52 5328 NW Anderson Hill Rd Silverdale, WA 98383 o Install three (3) Chatsworth 55053-503 equipment racks with 11729-503 double sided cable management and required grounding system. Racks to be spaced with front and rear aisle access with a minimum of 23 inches from walls and a minimum of 28 inches between rack rows. o Install 12" overhead cable ladder with individual top plate supports and code required grounding system. o All racks, ladders, and trays to meet appropriate seismic ratings. AUGUSTA 19689 Miller Bay Rd Suquamish, WA 98392 o Install Alpha Technologies CXPS-E3 48VDC power plant. o Install two (2) 48V 170AH battery strings with temperature sensors and string battery breakers. o Install Cordex HP CXRF 48-4.6KW rectifiers, rectifier module blanks, LVDB battery breakers and load breakers. o Install three (3) Chatsworth 55053-503 equipment racks with 11729-503 double sided cable management and required grounding system. Racks to be spaced with front and rear aisle access with a minimum of 23 inches from walls and a minimum of 28 inches between rack rows. o All racks, ladders, and trays to meet appropriate seismic ratings. o Install 12" overhead cable ladder with individual top plate supports and code required grounding system. o Install two (2) Amphenol 125GMT/NRG125GMT 125A fuse panels. o Evaluate capacity of current electrical service to feed the additional needs of Telecom equipment; contractor will install sub-panels from existing electrical service at each site that meets code requirements. o Install minimum 100A AC sub-panel. The 100-amp service panel shall be Eaton CH breaker panel or equivalent. o Install manual transfer switch with 4 pole circuit breaking mating connector. o Install three (3) 4000 lumen LED ceiling light fixtures evenly spaced in the building with an appropriate light switch at the doorway. o Install eight (8) 20A duplex receptacles with 2 receptacles each evenly spaced on each wall; one circuit per wall. o Install HVAC split system with heating and cooling capabilities; unit will be a 3-ton 36k btu heat pump mini split system with energy star certification. FOUR CORNERS 27618 Hansville Rd Kingston, WA 98346 o Install Alpha Technologies CXPS-E3 48VDC power plant. o Install two (2) 48V 170AH battery strings with temperature sensors and string battery breakers. o Install Cordex HP CXRF 48-4.6KW rectifiers, rectifier module blanks, LVDB battery breakers and load breakers. o Install five (5) Chatsworth 55053-503 equipment racks with 11729-503 double sided cable management and required grounding system. Racks to be spaced with front and rear aisle access with a minimum of 23 inches from walls and a minimum of 28 inches between rack rows. o All racks, ladders, and trays to meet appropriate seismic ratings. o Install 12" overhead cable ladder with individual top plate supports and code required grounding system. o Install three (3) Amphenol 125GMT/NRG125GMT 125A fuse panels. o Evaluate capacity of current electrical service to feed the additional needs of Telecom equipment; contractor will install sub-panels from existing electrical service at each site that meets code requirements. o Install minimum 100A AC sub-panel. The 100-amp service panel shall be Eaton CH breaker panel or equivalent. o Install manual transfer switch with 4 pole circuit breaking mating connector. o Install four (4) 4000 lumen LED ceiling light fixtures evenly spaced in the building with an appropriate light switch at the doorway. o Install eight (8) 20A duplex receptacles with 2 receptacles each evenly spaced on each wall; one circuit per wall. o Install HVAC split system with heating and cooling capabilities; unit will be a 3-ton 36k btu heat pump mini split system with energy star certification. TURKO 7230 Turko Ln NW Seabeck, WA 98380 o Install Alpha Technologies CXPS-E3 48VDC power plant. o Install two (2) 48V 170AH battery strings with temperature sensors and string battery breakers. o Install Cordex HP CXRF 48-4.6KW rectifiers, rectifier module blanks, LVDB battery breakers and load breakers. o Install twelve (12) Chatsworth 55053-503 equipment racks with 11729-503 double sided cable management and required grounding system. Racks to be spaced with front and rear aisle access with a minimum of 23 inches from walls and a minimum of 28 inches between rack rows. o All racks, ladders, and trays to meet appropriate seismic ratings. o Install 12" overhead cable ladder with individual top plate supports and code required grounding system. o Install six (6) Amphenol 125GMT/NRG125GMT 125A fuse panels. o Install HVAC split system with heating and cooling capabilities; unit will be a 3-ton 36k btu heat pump mini split system with energy star certification
Award
Power Plant
$593,174.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 17, 2024
February 16, 2024
Multiple Locations, Poulsbo, WA
Related To This Project
Poulsbo, WA
--
Poulsbo, WA
Bid Date: Apr 05 2024
Poulsbo, WA
Bid Date: Feb 15 2024
Poulsbo, WA
Bid Date: Feb 20 2024
Poulsbo, WA
Bid Date: Apr 16 2024
Poulsbo, WA
--
Poulsbo, WA
Bid Date: Mar 22 2024
Poulsbo, WA
Bid Date: Apr 04 2024
Poulsbo, WA
Bid Date: Nov 30 2023
Poulsbo, WA
Bid Date: Nov 30 2023
Poulsbo, WA
Bid Date: Nov 28 2023
Poulsbo, WA
Bid Date: Apr 08 2021
Poulsbo, WA
--
Poulsbo, WA
Bid Date: Oct 05 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.