BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Remodeling of a fire / police facility in Stockton, California. Completed plans call for the remodel of a fire / police facility.

**As of March 22, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** **As of February 28, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** Notice is hereby given that the Waterloo Morada Rural County Fire Protection District (DISTRICT) will receive sealed bids for Bid No. 23-01, Waterloo Morada Fire Station #2 Remodel. Work to Be Done: 1) Remove all brick from all exterior walls. If the stucco terminates at the top of the brick, plywood, or something similar shall be installed to properly secure the metal cladding 2) Skin all exterior walls & eves with 14g ribbed metal siding to match the style and color of the existing apparatus bay building. All transitions and seems will need to be finished to the satisfaction of the Fire District. 3) Construct an ADA-compliant ramp and rails to the front door of the house on the north side. The ramp shall be constructed of concrete. 4) Provide and install an ADA-compliant metal door with window, frame, and hardware. Replacing the current front door on the north side of the building. The door shall be painted in fire district-approved Red and frames Black. 5) Provide and install metal doors with window, frame, and hardware on the west wall. There is no existing door, the wall will need to be cut in. This door will lead from the kitchen to the outside. There will need to be a concrete landing, steps, and handrails constructed on the outside for the safe exiting of the building. The door and step are not required to be ADA-compliant. The door shall be painted in fire district-approved Red and frames Black. 6) Provide and install a metal door with a window, frame, and hardware that matches the front and the new kitchen side door. This door will be replacing the existing garage door. The door shall be painted in fire district-approved Red and frames Black. 7) Provide and install ribbed metal awning between the 2 buildings. This awning should span the entire length of the house. It will need to be angled appropriately to account for efficient drainage into the house gutter or other approved plan. The awning shall be painted black and gray, matching the existing colors 8) Paint all gutters and downspouts black. Paint roll-up garage door red (matching apparatus door color) and trim black. 9) Remodel bathrooms. Must meet ADA Compliance. When the demo has started, there shall be a plan in place to make construction of the new restrooms/showers the primary focus of the project. The time that the facility is without restrooms and showers shall be limited to a mutually agreed upon timeframe. Concept drawing will be provided the day of the mandatory jobwalk a) Demolish both bathrooms down to bare studs. b) Frame in, sheetrock, tape, texture, and paint the bathroom access door that is in the bedroom. c) Remove the hallway closet. Frame in wall, sheetrock, tape, texture, and paint. d) Relocate 2 windows and Eliminate 3rd window. Frame in and insulate eliminated windows. e) Replace the hallway bathroom entrance door with an ADA-compliant door. (Correct width) f) Frame in shower/toilet room meeting ADA compliance. (Tile shower. Provide and install a toilet. Provide and Install exhaust fan) g) Frame in shower/toilet room non-ADA with pocket door. (Tile shower. Provide and install a toilet. Provide and Install exhaust fan) h) Provide and install a 5' wide double sink vanity and mirror. (Sinks, faucets, drains, and water lines to be included) i) Provide and install tile flooring in both shower/toilet rooms and open areas of the bathroom. (Including tile wall base throughout) j) Provide and install LED lighting in both shower/toilet rooms and the main area of the bathroom. k) Paint all walls and ceiling. l) Re-install HVAC vents to provide sufficient heat and air to all three areas of the bathroom. m) Install alerting speakers (2) in restroom/shower rooms and tie into the system in the office. (Fire District will provide the speakers). Re-install existing speaker in main area of bathroom. Notice is hereby given pursuant to the provisions of Section 1770 et seq of the California Labor Code, each worker of the contractor and any of its subcontractors engaged in work on the Project shall be paid not less than the prevailing wage rate. The project is subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR). Pursuant to Labor Code Section 1725.5, the DIR established a Contractor Registration Program, in which no contractor or subcontractor shall bid on, be listed in a bid, or engage in the performance of any public work contract without being registered. Prime Contractor must have a valid Class B License. Bids shall be accompanied by a certified check, cashiers check, or a bidders bond in an amount not less than ten percent (10%) of total bids made payable to Waterloo Morada Fire District. The Fire District reserves the right to not move forward with the project and/or reduce scope if bids received are not within the Budget capabilities of the Fire District, as determined by the District Board of Directors. The substitution of appropriate securities in lieu of retention amounts from progress payments in accordance with Public Contract Code Section 22300 is permitted. Pursuant to Public Contract Code 3400(c)(2), Waterloo Morada Rural County Fire Protection District finds that it is in the best interest of the DISTRICT to standardize the products, equipment, and materials listed in Bid Documents in order to match other products/equipment in use on a particular work of improvement either completed or in the course of completion. Where a specific brand, trade name, material, or product identified in the bid documents, it shall be deemed to be followed by the words No Substitutions, and CONTRACTOR shall not make or request substitutions regarding any such product, equipment or material

Bid Results

Fire / Police

$430,778.00

Public - County

Remodeling

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
92
Bidding Soon
1,906
All Active Projects
798
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.