BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Simi Valley, California. Conceptual plans call for the renovation of a water / sewer project.

Request for Professional Engineering Services to Develop Plans and Specifications for the Demolition and Installation of Anaerobic Digesters and Secondary Clarifiers Equipment. The City of Simi Valley invites your firm to submit a proposal for Professional Engineering Services to Develop Plans and Specifications for the Demolition and Installation of Anaerobic Digesters and Secondary Clarifiers Equipment at the Water Quality Control Plant. Should you have any questions, or require additional information, please contact me at (805) 583-6809. Additional information may be obtained by contacting: City of Simi Valley 2929 Tapo Canyon Road Simi Valley, CA 93063 Contact: John Hamilton (805) 583-6809 jhamilton@simivalley.org The City of Simi Valley (City) owns and operates wastewater collection and treatment facilities, located at the Water Quality Control Plant (WQCP), that serve approximately 126,000 residents. The WQCP has a design capacity of 12.5 MGD and is presently operating at 8 MGD. The equipment at the WQCP's two (2) anaerobic digesters and two (2) secondary clarifiers were initially part of a Design Build (DB) project that began in 2019. The DB project was to demolish and install new equipment at both digester and clarifier facilities. Due to the re-organization of the scope of work, both were removed from the DB project. DB design plans and specifications (Exhibit D) were prepared for the installation of four (4) Anaergia 10 HP propeller type mixers into two (2) digesters, and two (2) secondary clarifiers, but were not installed. All equipment required for the purposes of installation were procured and are currently stored on site. The City, therefore, requires professional engineering services to execute this project. The City is thus requesting proposals (RFP) from qualified consulting firms (Consultant) to provide professional engineering services to prepare plans and specifications for bid packages for the demolition and installation of: [1] two (2) digesters with four (4) Anaergia 10 HP propeller type mixers, two (2) recirculation pumps, replacement of above ground valves/piping, and two (2) heat exchangers; and [2] two (2) secondary clarifiers. Both equipment are located at the City's WQCP. Sub-parts from the existing plans and specifications for this uncompleted DB project will be amended to prepare two (2) bid packages (digester and secondary clarifiers) to be advertised in July 2024 as Design-BidBuild (DBB) projects. The expected completion date of the DBB projects will be June 30, 2025. SCOPE OF WORK A. Digesters, Mixers, Pumps, Pipes, and Heat Exchangers Plan shall include: 1. Extract, review, and amend an existing DB design (Exhibit D) for the: a. demolition of existing equipment at two (2) digesters, and b. installation of four (4) owner provided Anaergia Mixers i. two (2) into digesters 3 ii. two (2) into digester 4 c. installation of two (2) owner provided heat exchangers i. one (1) for digester 3 and ii. one (1) for digester 4 d. installation of recirculation pumps 2. Digester tank rehabilitation including: a. dewatering of digester b. removal of debris c. cleaning d. concrete wall structural repair, and e. epoxy coating of inner tank walls 3. Replacement of digester above ground piping and valves (not owner provided) 4. Installation of a Davit Crane on the Anaerobic Digester for removal of the Anaergia Mixer from the top of the tank. 5. Add ancillary items found during the design progression as required 6. Third Party Inspection B. Secondary Clarifiers 1 and 2 Plans shall include: 1. Extract, review, and amend the existing DB design (Exhibit D) for the: a. demolition of secondary clarifiers 1 and 2* b. installation of secondary clarifiers 1 and 2* 2. Add ancillary items such as stairs, guard rails, davit crane mount, and as found during the design progression as required 3. Third Party Inspection * Note that secondary clarifiers 3 & 4 were installed in the DB project C. Other Services 1. DBB design plans, specifications, and Engineering construction estimates 2. Bid support 3. Construction management 4. Construction document management 5. Construction technical support, and 6. Construction closeout Final project design documents to be submitted before July 15, 2024 for posting upon review and approval, with an expected award date of September 2024, and Bid and construction support until June 30, 2025. The City reserves the right to reject any and all proposals, and to award or not to award a contract. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$100,000.00

Public - City

Renovation

176

26

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
84
Bidding Soon
1,862
All Active Projects
801
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

img_map_placeholder

To Be Determined, Simi Valley, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.