BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Concord, North Carolina. Conceptual plans call for site work for a bridge / tunnel.

The City of Concord is soliciting proposals from qualified engineering consultants to provide construction contract documents (i.e. design drawings, up-front/technical specifications package) to be used for bidding purposes, along with the completion of an engineer's cost estimate, for the proposed Farmwood Stormwater Culvert Replacement project. In addition, the engineering consultant will be asked to answer design and/or constructability related questions during the bid phase of the project. The inclusion of this particular project in the City's approved FY 2022-2026 Capital Improvement Program was a result of findings in the 2010 Coddle Creek Watershed Master Plan that involved field data collection and evaluation. The Master Plan showed that this road does not meet the intended performance criteria based on predictions for future conditions due to overtopping the 10-year event. The current culvert is double 90" corrugated metal barrels. The proposed configuration in the Master Plan was to install 2-8x8' concrete box culverts. Farmwood Boulevard is the sole entrance to Wolf Meadow Elementary, which is a year-round elementary school. Our purpose is to obtain expert professional, technical and advisory services at the discretion of the City of Concord for designing a stormwater culvert replacement. In addition, an individual firm or joint venture (team) may respond to this Request for Qualifications (RFQ). The engineering consultant selected may be asked to provide any or all of the following services: 1. Complete the necessary civil engineering design work within the preliminary design phase of the project and submit plan and specification documents for City personnel review and comments, including the completion of a corresponding technical memorandum consisting of an overview of the preliminary design phase and the necessary recommendations to be considered in the final design phase. 2. Given the review comments received from City personnel for both the preliminary design documents and the technical memorandum, complete the necessary civil engineering design work within the final design phase of the project and submit plan and specification documents for City personnel review and comments. 3. Complete and finalize the necessary construction contract documents package (i.e. design drawings, up-front/technical specifications package documents) by a registered Professional Engineer in the state of North Carolina to be used for bidding purposes and construction of the project. This work will include the completion of an engineer's cost estimate based on the completed and approved construction contract documents. The final design drawings shall be submitted to the City's Engineering Department staff in electronic format, including the AutoCAD (i.e. Release 18 with Civil 3-D or latest version utilized by the City's Engineering Department) conversion to ArcGIS shapefiles. 4. Provide answers to the final construction contract documents and/or constructability related questions during the bid phase of the project. Questions concerning the scope of this project should be directed in writing to Ryan LeClear, Purchasing Manager at the address below. Any amendments to this RFQ shall be made in writing and distributed as an addendum. Ryan LeClear, Purchasing Manager Alfred M. Brown Operations Center P.O. Box 308 635 Alfred Brown Jr. Court SW Concord, North Carolina 28026 704-920-5447 (Office) 704-785-8856 (Fax) E-mail: leclearr@concordnc.gov It is projected that City personnel will complete the proposal evaluation process and make a recommendation of the top firm to the City Manager, including a completed scope of work and corresponding engineering consultant's fee, by late February of 2024. The contract with the top firm must be approved by City Council. Once the contract is approved by City Council and executed by the City Manager, a notice to proceed will be sent to the firm. The firm will then have approximately twelve (12) months to complete the design phase of this project. The City reserves the right to reject any and all statements of interest. The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$400,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
103
Bidding Soon
1,597
All Active Projects
659
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 23, 2024

img_map_placeholder

Multiple Locations, Concord, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.