BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 20, 2023 at 7:00 PM

Updated January 29, 2024

Site work and paving for a civil project in Pilot Butte, Saskatchewan. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a bridge / tunnel.

The work involves the removal of an existing timber bridge with 3 - 2400 mm (8ft.) diameter corrugated steel pipe culverts including a grade raise in accordance with the applicable Ministry of Highways specifications, located at Tower Rd, NW 12-18-19 W2, Rural Municipality of Sherwood No. 159 for a Unit Price Contract in accordance with the following: 1. The work shall consist of removing and disposing of the existing wood pile bridge and also include excavation of embankment material located at Tower Rd, NW 12-18-19 W2. 2. Replace the bridge with 3-2400 mm (8 ft.) steel corrugated pipe culverts approximately 30 metres in length (to be supplied by the RM) including grade raise of the road elevation as required. 3. Minimum 8 metre road top. 4. Minimum of 1 metre of fill over the culverts, extending approximately 30 meters north and 30 meters south of the culverts with minimum 4:1 road slopes. 5. The bottom of the creek being sub cut to the depth of suitable material to build on.

Post-Bid

Bridges / Tunnels

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
16
Bidding Soon
187
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2024

February 8, 2024

Project location map

Tower Rd, Pilot Butte, SK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.