BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2024 at 7:00 PM

Updated June 29, 2024

Site work and paving for a road / highway in Ephrata, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Estimated cost is $1,200,000 to $1,400,000. Baseline West and Silica Road Project Widening All Bid Proposals Shall Be Accompanied by a Bid Proposal Deposit in Cash, Certified Check, Cashiers Check, or Surety Bond in an Amount Equal to Five Percent (5%) of the Amount of Such Bid Proposal. No Conditional Bid Bond Will Be Accepted. Should the Successful Bidderfail to Enter Into Such Contract and Furnish a Satisfactory Performance Bond Within the Time Stated in the Specifications, the Bid Proposal Deposit Shall Be Forfeited to Grant County. The Following is Applicable to Federal-aid Projects: . The Grant County, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.s.c. 2000d to 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response To This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. Grant County Department of Public Works may be answer questions regarding these bid documents and to show this project to prospective bid is: Grant County Department of Public Works 124 Enterprise St. S.E. Ephrata, WA. 98823 Phone: (509)754-6082(509)754-6087 Save Bren P.E. County Road Engineer This contract provides for the shoulder widening and overlaying of 0.87 miles of Baseline West Road, from Silica Road East 0.87 Miles and for the widening of Silica Road from Sunland Road South 1 mile, and the overlaying of Silica Road from mile South of Sunland Road to 1 mile south of Sunland Road, both are a two lane county road in Grant County, WA, and includes, roadway excavation, embankment compaction, crushed surfacing base courser, HMA, roadway striping, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.

Award

Roads / Highways

$1,474,495.00

Public - County

Paving, Site Work

21

6

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
49
Bidding Soon
301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2024

March 4, 2024

Project location map

Multiple Locations, Ephrata, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.