BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2024 at 7:00 PM

Updated February 27, 2024

Demolition, site work, paving, renovation and addition to a mixed-use development in Cedar City, Utah. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a 5,300-square-foot transportation facility; for site work for a transportation facility; water / sewer project; and for paving for a transportation facility.

**As of February 26,2024, this project has not yet been awarded. A timeline for the award has not yet been established.** Owner Number: 3-49-0005-039-2021 (CRRSA), 3-49-0005-041-2021(ARPA), 3-49-0005-XXX-2024(BIL AIG) Site Address: 2560 West Aviation Way The Cedar City Regional Airport wishes to construct an addition to the Terminal facility increasing the holdroom and bag claim areas by approximately 5300 SF. The exterior façade is a stone finish with a vaulted curtain wall. Project will require some nighttime work to construct temporary walls and a new wall at the TSA screening area. The bag claim area will have two new overhead doors for bag induction and a small piece of conveyor. Site work is minimal with the addition of a new storm line, relocation of a water line and hydrant and small amount of paving. Two existing chillers will have to be relocated and a temporary chiller provided during the summer months. Two smaller HVAC units will be installed on the new TPO roof with access ladder. Construction duration will be 330 calendar days with an anticipated award around the first of March 2024. Additional Description: Schedule I - Terminal Expansion The main items of work involved in the proposed project are: Construction of an addition to the Terminal facility increasing the hold room and bag claim areas by approximately 5,300 SF. The exterior façade is a stone finish with a vaulted curtain wall. Project will require some nighttime work to construct temporary walls and a new wall at the TSA screening area. The bag claim area will have two new overhead doors for bag induction and a small piece of conveyor. Site work is minimal with the addition of a new storm line, relocation of a water line and hydrant and small amount of paving. Two existing chillers will have to be relocated and a temporary chiller provided during the summer months. Two smaller HVAC units will be installed on the new TPO roof with access ladder.

Bid Results

Transportation Terminals

$4,540,000.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

108

33

29

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
10
Bidding Soon
162
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

March 18, 2024

Project location map

2560 Aviation Way, Cedar City, UT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.