EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 1, 2024 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a residential development in Pittsburgh, Pennsylvania. Completed plans call for the construction of a 48,377-square-foot, four-story above grade residential development; and for site work for a residential development.

The Allies & Ross Management and Development Corporation ("ARMDC"), an instrumentality of the Housing Authority of the City of Pittsburgh ("HACP"), hereby requests proposals from qualified professionals to perform work for The Northview Midrise will consist of the new construction of a four-story building along Penfort Street in the Northview Heights neighborhood. The building will consist of forty-three (43) rental apartment units along with approximately 4,800 square feet of commercial space on the 1st floor. The United States Department of Housing and Urban Development ("HUD") is anticipated to provide the funding for this work through the Capital Fund Program and all work performed must be in compliance with all rules and regulations of this program and all other applicable Federal regulations including but not limited to, Handicap Accessibility (Section 504), Americans with Disabilities Act ("ADA"), Uniform Federal Accessibility Standards ("UFAS"), Davis-Bacon wage requirements, Environmental Protection Agency rules and regulations, HUD's Modernization Design Standards and Federal procurement requirements. In addition to the Federal laws and regulations, all work must also be performed in compliance with all Commonwealth of Pennsylvania laws and regulations, and local building codes. The contract(s) resulting from this proposal shall provide for 450 calendar days of the Notice to Proceed. The contract term shall commence on the date specified in the Agreement issued by ARMDC. Question Deadline: Jan 18, 2024 09:00 am . If you have any questions regarding the Section 3 Requirements or would like to discuss goals and planning for Section 3 Requirements please contact Mr. Lloyd Wilson, Coordinator, by e-mail at lloyd.wilson@hacp.org or by contacting him at the Housing Authority of the City of Pittsburgh, Resident Employment Program located at the Bedford Hope Center, 2305 Bedford Ave, Pittsburgh PA 15219, telephone (412) 395-3950, ext. 1048. ARMDC will also accept online submissions for this invitation for bid in addition to accepting submissions at the 412 Boulevard of the Allies office. Please include your name and email address as prompted before submitting and upload all relevant attachments in the same document. Formatting for online submissions should be organized in the same manner as if submitted via CD or flash drive. Bidders shall be prepared to review all aspects of the site necessary to prepare a bid. Allies & Ross Management and Development Corporation (ARMDC) is the instrumentality of the Housing Authority of the City of Pittsburgh (HACP, Housing Authority or Authority), and are used and referenced interchangeably throughout the Bid Forms and Project Manual. It is the intention of ARMDC to award a contract to the lowest responsive and responsible bidder. All bids shall remain open for the period specified in the IFB, which in no case shall be less than sixty (60) calendar days from the bid opening. All bids of $10,000 or more must be accompanied by a negotiable bid guarantee that shall not be less than 5% of the amount of the bid. No bid guarantee is required for bids under $10,000. In accordance with 2 CFR 200.318(h) formerly 24 CFR Section 85.36(b)(8), ARMDC is permitted to make awards only to responsible bidders possessing the ability to perform successfully under the terms and conditions of the proposed contract. Prior to award of any contract, ARMDC shall conduct a pre-contract survey. Consideration will be given to such matters as bidder integrity, compliance with public policy, record of past performance, and financial and technical resources. All bids must include a completed and signed Form of Agreement (Form 00500) as part of the bid. If the bid is successful and approved by ARMDC Board of Directors and HACP Board of Commissioners (if applicable). The successful bidder will be required to furnish an assurance of completion (performance and payment bond) each equal to 100% of the contract price. ARMDC reserves the right to reject any or all bids or to waive any informality in the bidding. The Contractor will be required to comply with all applicable Equal Employment Opportunity requirements for Federally-Assisted Construction Contracts. The Contractor must insure that employees and applicants for employment are not discriminated against because of race, color, religion, sexual preference, handicap or national origin. ARMDC's Minority and Woman Business (MBE/WBE) participation goals are as follows: -- MBE Goal: 25% -- WBE Goal: 10% If you have any questions regarding the ARMDC / HACP MBE/WBE goals please contact Ms.Renelda Colvin, MBE/WBE Compliance Specialist, by e-mail at renelda.colvin@hacp.org or by contacting her at the Procurement Department, Housing Authority of the City of Pittsburgh. Bid Results :: General Construction :: Franjo Construction :: $9,681,000.00 Plumbing :: WG Tomko :: $1,108,000.00 Mechanical :: Controlled Climate Systems, Inc. :: $1,295,186.00

Bid Results

Residential Subdivision

$10,789,000.00

Public - City

New Construction, Site Work

235

35

27

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Mockups, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Stone Masonry
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Underlayment, Shop-Fabricated Structural Wood, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Vapor Retarders, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Roofing and Siding Panels, Siding, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Accessories, Ridge Vents, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants, Acoustical Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Postal Specialties
Division 11 - Equipment

Division 11 - Equipment

Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Furniture, Residential Furniture, Beds
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction, Sound, Vibration, and Seismic Control
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geotextiles for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Mowing, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Irrigation, Planting, Planting Preparation, Turf and Grasses, Seeding, Plants, Shrubs, Trees, Planting Accessories, Landscape Edging
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
109
Bidding Soon
1,020
All Active Projects
482
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

February 19, 2024

img_map_placeholder

246 Penfort St, Pittsburgh, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Northview Heights Midrise Development

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.