BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a mixed-use development in Elk Grove, California. Working plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

**As of February 16, 2024. Project is cancelled. No definite date for the rebid.** The Elk Grove Unified School District ("District") is requesting a Statement of Qualifications/Proposal (SOQ/P) from Contractors holding a Class B license, to perform Lease-Leaseback construction services for the Robert L. Trigg Education Center Expansion project. The District will not review submittals received after the time and date above. Facsimile (FAX) copies of the SOQ/P will not be accepted. The Administration reserves the right to accept or reject any and all SOQ/P, to negotiate with any and all-responsible firms, and to waive any informality in the process. The District is not responsible for any expenses related to the preparation or presentation of the SOQ/P, including travel costs. The SOQ/P may be withdrawn at any time prior to the closing date and time for receipt of SOQ/P. In order to control information disseminated regarding this SOQ/P, firms interested in submitting SOQ/P are directed not to make personal contact with members of the Governing Board or District Administration with the exception of the individual, or department staff listed on the SOQ/P packet. This includes unauthorized visits to District-educating facilities. In accordance with California Labor Code Section 1770 et seq. payment of the appropriate general prevailing rate of wages for all crafts employed on the public works site is required of the Contractor and all subcontractors. This project has a goal of 3% Disabled Veterans Business Enterprises (DVBE) participation per the State Allocation Board requirements. Compliance with California Education Code Section 45125.1 mandating fingerprinting requirements applies to this project. The RFQ/P respondent is encouraged to demonstrate within Tab D of their SOQ/P of the Firm's understanding and ability to perform the work. The estimated total construction cost/budget for the Project is $24,000,000. Last questions due in regard to RFQ/P Jan. 11, 2024 Responding Contractors must be prequalified by the District Jan. 12, 2024 V. SCOPE OF WORK The Scope of Work for this RFP shall include, but not limited to the following Construction Services: 1. Provide constructability analysis with particular attention to the schedule and budget and evaluate materials and methods to assist the District with identifying cost savings measures. 2. Prepare preliminary and detailed estimates of project costs. 3. Development of detailed construction critical path project schedule and campus considerations. 4. Attend meetings as necessary. After assigning the Responsible Contractor, the following shall occur: 5. Soliciting bids for assembly of a GMP. 6. Presentation of GMP to Board. 7. Administrating Construction of Project. 8. Coordination of record drawings and specifications. 9. Obtaining and coordinating final testing, documentation, and governmental inspections. 10. Preparation of accounting and closeout reports. 11. Other responsibilities as necessary for the completion of the project. Inquiries: All questions about the meaning or intent of this RFQ/P shall be submitted to Facilities and Planning Department, in writing. Address inquiries to Susan Bell, Chief Facilities Officer, at subell@egusd.net. Please copy Michael Bean at mbean@egusd.net and Darren Antonovich at dantonov@egusd.net on all inquiries sent to Susan Bell. Bonding. Firms are further advised that if they are pre-qualified to provide services to the District and are subsequently awarded a contract, they will be required to furnish a Performance Bond, and a Payment (Materials and Labor) Bond, both in the amount of one hundred percent of the contract price.

Final Planning

Educational

$24,000,000.00

Public - County

Addition, Demolition, Site Work

3

5

4

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
160
Bidding Soon
3,140
All Active Projects
1,273
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 26, 2024

August 16, 2024

img_map_placeholder

9510 Elk Grove Florin Rd, Elk Grove, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.