BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Concord, New Hampshire. Contact the soliciting agency for additional information.

The work for this project will consist of completing comprehensive acoustic leak detection surveys on the distribution systems of the water systems listed in Appendix A, issuing reports, and communicating with water systems and NHDES. NHDES understands this Scope of Work may not fully describe all services required to carry out the project; therefore, the firm may make modifications to the Scope of Work based on their professional expertise in this subject area. The firm is also encouraged to incorporate items deemed necessary to meet the needs of NHDES in completion of the project, including receiving input and allowing NHDES to review preliminary results. A. Field Work The leak detection surveys shall be conducted in accordance with the fourth edition of the AWWA Manual of Water Supply Practices M36: Water Audits and Loss Control Programs. The leak detection surveys must be performed in two phases: an initial screening of the distribution system to identify suspected leaks followed by a pinpointing phase to locate the suspected leaks. A detailed report of the survey findings must be filed with NHDES and the water system at the conclusion of each leak detection survey. It will be the responsibility of the water system to repair any leaks found. a. Initial Survey i. The firm shall utilize specialized equipment to "listen" for sounds on the water mains as well as on a comprehensive spread of direct contact points including, but not limited to, main line gate valves, fire hydrants, meter/curb valves, and blow-offs. ii. The water systems in this project range from clustered condominium complexes to mobile home parks to larger municipal systems. The water systems also vary in pipe materials, pipe sizes, number of contact points, and accuracy of information about the distribution system (ex. quality of maps). As a result, the methodology will vary from water system to water system. b. Pinpointing Phase i. In areas where a potential leak is detected, the firm shall first confirm the locations of mains using maps and/or pipe locators. ii. The firm shall then perform an intensified pattern of sonic tests directly over the mains to identify the location of the leak. An electronic digital leak noise correlator may be used as a pinpointing tool, but a ground microphone shall be used to confirm the correlator results. iii. In the case where a leak is suspected to be associated with a hydrant, the firm shall contact the system representative before operating the hydrant. Then, the hydrant shall be isolated, and additional listening on contact points or over the pipe shall be conducted to rule out other types of leaks. iv. Information about the leak and leak location shall be noted for the leak report, and the coordinates of the leak location shall be taken on-site. All questions and inquiries related to this Request for Proposals (RFP) should be made in writing to Kelsey Vaughn at waterconservation@des.nh.gov by January 9, 2024 at 4:00pm EST

Post-Bid

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
440
Active Projects
244
Bidding Soon
3,634
All Active Projects
1,389
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 19, 2024

February 19, 2024

img_map_placeholder

Multiple Locations, Concord, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.