BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Sacramento, California. Completed plans call for site work for a water / sewer project.

Contractor will furnish all labor, materials, services, transportation, appliances, and mechanical workmanship required for this Agreement, Contract No. 6022, as provided for and set forth in the Plans and Specifications, or in either of them. All of the work done under this Agreement shall be under the supervision of and performed to the satisfaction of the District Engineer who shall have the right to reject any and all materials and supplies furnished by Contractor which do not comply with said Plans and Specifications, together with the right to require Contractor to replace any and all work furnished by Contractor which is not, either in workmanship or material, in strict accordance with the Plans and Specifications. PROJECT DESCRIPTION: Construct approximately 4 miles of large diameter (66) recycled water pipeline. DISADVANTAGE BUSINESS ENTERPRISE (DBE) SOLICITATIONS: Project requires posting DBE solicitations for bids or proposals for a minimum of 30 calendar days before the bid opening date. CONTRACTOR LICENSE REQUIRED: GENERAL ENGINEERING CONTRACTOR, CLASS A Award of this Contract requires a valid California contractor's license with the classification identified above. REGIONAL SAN CONTACT: Kyle Frazier, PE Sr. Civil Engineer EchoWater and Harvest Water Projects Program Management Office Questions will only be answered if posted to the Public Purchase website listed below. All other communication should be sent to EGTP@sacsewer.com. Each bid must be submitted on the bid forms provided in the Contract Documents. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashiers check payable to the Treasurer of Sacramento County, for an amount not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder shall be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the Sacramento Regional County Sanitation District, each for not less than one hundred percent (100%) of the contract price. The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in the judgment of the Board, is the lowest responsive bid of a responsible bidder. MM3-EG-06-1014

Award

Water / Sewer

$51,283,600.00

Public - County

Site Work

189

31

28

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
81
Bidding Soon
1,514
All Active Projects
627
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

April 8, 2024

img_map_placeholder

Multiple Locations, Sacramento, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.