BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Oak Park, Illinois. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of July 25, 2024, Oak Park trustees approved an engineer to do the preliminary redesign on the bridge. The bridge will be replaced along with the Interstate 290 reconstruction. Design work could start as soon as fall 2024 and will take about 16 months. * Bidding information below The Village of Oak Park, Illinois (the Village) is issuing a Request for Qualifications (RFQ) to solicit qualifications from interested engineering firms to provide Phase I Preliminary Engineering Services and Phase II Design Engineering Services for the Home Avenue Pedestrian Bridge Replacement (IDOT Structure Number 0162060). The objective of this project is to replace and widen the deteriorating bridge. The selected consultant shall develop alternative designs representing low, medium, and high cost scenarios for the replacement bridge. The low-cost scenario should include bridge replacement with improvements to the width and accessibility of the entryways and additional lighting. The medium cost scenario should include some architectural elements, either via attachments or in the design of the bridge itself, and enhanced lighting, and the high cost scenario shall be an architecturally-significant bridge, either via attachments or in the design of the bridge itself, with park-like entrances / approaches. The Village of Oak Park will select the preferred alternate bridge design following public engagement and final direction from the Village Board. All contact between prospective Consultants and the Village with respect to this RFQ will be formally held at scheduled meetings or in writing through the issuing representative. Questions and comments regarding meaning or interpretation of any aspect of this RFQ must be submitted in writing to lgriffin@oak-park.us and must be received on or before January 26, 2024. Only written questions will be accepted. Questions and/or comments which are submitted after the deadline set forth within this RFQ will not be answered. The method of Contractor Selection has not been Determined at this time.

Design

Bridges / Tunnels

$1,812,191.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
89
Bidding Soon
1,791
All Active Projects
779
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

img_map_placeholder

Home Ave, Oak Park, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.