BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Old Saybrook, Connecticut. Working plans call for site work for a playground / park / athletic field.

As of 2/1/2024 the Town rejected all the bids for this project no award was made. Additional details on the rebid are not yet available. Town Of Old Saybrook Requests Proposals And Specific Itemized Pricing From Those Who Meet The Qualifications To Resurface The Town's Three (3) Pickle Ball Courts Located At 225 Main Street, Old Saybrook And To Furnish All Materials, Labor And Insurance To Perform Said Work. Must Have At Least Ten (10) Years Of Documented Experience In Similar Work. Must Be Able To Commence Work Immediately Following Town Approval And Complete The Project Within Six (6) Months Of Contract Award. Must Meet Any And All Additional Requirements And/or Qualifications As Detailed In This Document. Must Be A Connecticut Licensed Firm The Town Of Old Saybrook Reserves The Right To Reject Any And All Bids. Proposals Transmitted By Fax Or Email Will Not Be Accepted Or Reviewed. An Affirmative Action/equal Opportunity Employer, Mbe's, Wbe's And Sbe's Are Encouraged To Submit Scope of Work: 1. Permitting as necessary (town job - no permit fees). 2. Provide all necessary labor and other work as required. 3. MOBILIZATION - Mobilize the necessary equipment to perform the required work. Fee includes all that is necessary to set up the job and organize the necessary equipment that is needed to load and mobilize to and from the job site each day. 4. Use a "High Powered' Cleaning apparatus; thoroughly clean existing surface free of all algae, mold, dirt and any other foreign materials on the courts. Specify all other methods that will be used to eliminate court vegetation. 5. COLOR COATING- Furnish and install (at a minimum) two (2) coat acrylic color coating to entire area: One resurfacer coat and one finish coat. 6. PICKLEBALL LINE STRIPING- Layout and stripe all lines per USAPA. Apply one coat of acrylic line primer. Once line primer has cured apply one (1) coat of textured white line paint. Questions may be directed, in WRITING and only by email to the following address: Carl.fortuna@oldsaybrookct.gov

Final Planning

Playgrounds / Parks / Athletic Fields

$11,945.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
174
Bidding Soon
3,332
All Active Projects
1,442
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2024

May 16, 2024

img_map_placeholder

225 Main St, Old Saybrook, CT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.