Site work and paving for a road / highway in Reno, Nevada. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Consists of constructing approximately 175 Hot Mix Asphalt (HMA) patches totaling approximately 26,000 square feet of 4 to 8-inch deep permanent HMA patches. Estimated Cost: $392,000 Question Deadline 01/23/2024 at 12:00 PM PT All questions, requests for information, and correspondence shall be directed via email to the following CSD Project Manager: Beau Duc bduc@washoecounty.gov Community Services Department, Engineering and Capital Projects Division Bid Bond Required WORK UNDER THIS CONTRACT: includes but is not limited to, all materials, labor, operations, tools, expendable equipment, utility and transportation service, any and all travel expenses (previously approved by County), and all incidental items necessary to perform and complete the required Scope of Work in a workmanlike manner, complete and on schedule. 2. The Site Address of the Work to be performed is: a. Truckee Meadows 3. The Scope of Work includes, but is not limited to, the following: a. The work consists of constructing approximately 175 Hot Mix Asphalt (HMA) patches totaling approximately 26,000 square feet of 4 to 8-inch deep permanent HMA patches. b. Work includes; mobilization, saw cutting of existing pavement, excavating, removing and legally disposing of the existing temporary asphalt patches, re-compaction of the existing aggregate base material so its suitable for pavement placement, tack coating of all surfaces, placement and compaction of a Type 3 asphaltic pavement, all other incidental items, and all other work in accordance with the general provisions and special provisions of this contract. c. All permanent patches shall be HMA 1/2 " Type 3 PG64-28 with 3% voids 50 blows and no more than 15% RAP, or HMA 1/2 " Type 3 PG64-28NV with 3% voids 50 blows and no more than 15% RAP. d. All permanent patches shall be sealed with SS-1H and sand meeting requirements of Standard Specifications of Public Works Construction (SSPWC) 200.02.07. e. Work includes installation of approximately 50 concrete water and gas valve collars and adjustment of approximately 5 concrete manhole collars. f. Provide traffic control as specified in the special provisions of this contract. g. The Owner will provide detailed listings of the locations where asphalt street patching is required on a periodic basis commencing after the Notice to Proceed has been presented to the Contractor. The Contractor will have fifteen (15) calendar days after receipt of each such period listing in which to accomplish the work contained on that listing. The Contractor shall notify the Owner 5 (five) days in advance of the scheduled time of repairs. The quantity of work shown on each patch listing will be a quantity that can be practically accomplished within the fifteen (15) calendar day period. The Contractor will be paid for work completed on a list after submission of a pay request, subject to agreement by the County upon all quantities submitted. The contract will terminate on December 31, 2025. 4. See Bid Proposal on page 12. 5. The Owner reserves the right to add/remove from the unit priced scope for the project as needed at scheduled unit prices to ensure successful completion of the project within scope and budget.

Award

Roads / Highways

$384,007.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
14
Bidding Soon
229
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

March 26, 2024

img_map_placeholder

Multiple Locations, Reno, NV


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.