BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Stevens Point, Wisconsin. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for site work for a educational facility; and for the renovation of a educational facility.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of: A new 2-story, 55,218 SF Student Health and Wellness Center addition to Champions Hall. Situated in the southwest corner of the facility, the new footprint demolishes Parking Lot F West and a small 1-story storage area, replacing both to the north with a new 1-story storage addition and new accessible parking. Exterior materials include brick, metal cladding, and curtain wall glazing. Inside, the addition provides new collaborative space for Fitness, Student Health, Counseling, and Testing Services programs. Separated from the existing building with a fire wall, this Type II-B steel structure features a concrete slab on grade, composite elevated deck, and steel roof deck. All new spaces will be protected with automatic sprinklers and will be fully accessible. Minor interior renovations to the existing facility for connecting circulation and infrastructure will be necessary. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted Please contact Chad Bloedel, (414) 290-3713, cbloedel@kahlerslater.com for additional information Bid date note : PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method)

Award

Educational

$21,792,818.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

246

70

106

8

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
22
Bidding Soon
956
All Active Projects
231
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 13, 2024

May 27, 2024

December 31, 2025

img_map_placeholder

2050 4th Ave, Stevens Point, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.