BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a civil project in Sedalia, Missouri. Completed plans call for site work for a water / sewer project.

The City of Sedalia, Missouri is requesting qualifications for design-build services to address the following: 1) New Equalization Basin designed to handle the flow from both the North and Central Wastewater Treatment Plant. Basin shall be sized to meet minimum MoDNR standards and all Federal, State and local standards. In addition, basin shall be designed or ease of maintenance and sludge removal. Basin shall be located northwest of the existing Central WWTP on city ownedproperty. 2) New Pump Station and Force Main and or gravity line between the new equalization basin and the Central WWTP for processing. 3) Dredging and removal of material of existing equalization basin at Central WWTP and North WWTP. 4) New Pump Station, to be sited at the current North Wastewater Treatment Plant; sized to handle the design flow of the existing wastewater treatment plant and existing equalization basin. 5) Force Main and/or gravity main line from the new pump station, at the North Wastewater Treatment Plant, to the Central Wastewater Treatment Plant, using existing right-of-way and/or easement. 6) New Headworks at Central WWTP for a Design flow between 5 - 6 MGD. 7) New Solids Handling at Central WWTP for a Design Flow between5 - 6 MGD. 8) New Process Trainat the Central WWTP (Primary Clarifiers, Secondary Clarifiers, Aeration Basin, Flows plitter, Misc.) 9) Evaluateand Review of existing UV System; size to accommodate Design Flowbetween5 - 6MGD. 10) Evaluate and Review of existing SCADA Systemto ensure allsystems are monitored. 11) RelocatedexistingTemporaryScreeningfrom Central WWTP to North WWTP. 12) Constructionof New Shop/Officefor vehiclesand staff. 13) Decommission NorthWWTP. 14) Decommission facilitiesat Central WWTP that are not required. 15) Prepare a cost estimate,to include design-build, andprioritylist of projectsfor theSoutheastWWTP, for constructionpurposes,depending on cost include for improvementsto the North and Central WWTP. Nondiscriminationin Employment: "Bidderson this work will be requiredto comply with the President's ExecutiveOrder Number 11246. Requirements for bidders and contractorsunderthis order are explainedin the specifications." The design-build services requiredinclude design services,construction services,and/or constructionoversight of the project.This projectis beingfinanced through theMissouri State Revolving Fund, bythe Water and Wastewater Loan RevolvingFund and federalCapitalizationGrantsto Missouri. The City of Sedalia, Missouri's an Equal OpportunityEmployerandinvites the submission of bids fromDisadvantagedBusinessEnterprises." The City of Sedalia is an Equal OpportunityEmployer. EvaluationCommittee: An evaluationcommitteeestablished by the City will reviewthe Statement of Qualifications (SOQ) in accordancewith the EvaluationCriteria set withinthis RFQ. The committee may ask the respondentto supplementtheir SOQ with additional information. The committeewill consist of a minimumof three (3) membersfrom within and/oroutside the City. Interviews:The City has not chosen to conduct interviewsas part of the selection process.

Award

Water / Sewer

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
35
Bidding Soon
523
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2024

May 22, 2024

img_map_placeholder

To Be Determined, Sedalia, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.