BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2024 at 8:00 PM

Updated April 2, 2024

Site work and paving for a bridge / tunnel in Miami, Florida. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of April 01, 2024, the project was awarded on March 5, 2024. The award information is not yet determined. SCOPE OF WORK A. Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to perform the rehabilitation of two bridges in accordance with the Contract Documents. B. Work includes but is not limited to the following: Concrete repairs, structural steel repairs, structural steel painting, lighting update, bridgesignage update and minor aesthetic improvements. C. If any changes are required due to conflict of design and or field conditions, the Engineer will make the final determination. D. The Contractor and all subcontractors, under this Contract, are prohibited from performing any work, other than specified in the Contract and/or directed by the Engineer, within the limits of the project site, without prior written notification to the Engineer. This includes any work for private or commercial entities. The location of work to be performed under the terms of this Contract shall be as follows: 1. Bridge No. 874129 along South Hook Square over Miami Canal 2. Bridge No. 874130 along Curtiss Parkway over Miami Canal

Bid Results

Bridges / Tunnels

$4,584,572.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

23

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

April 29, 2024

Project location map

Multiple Locations, Miami, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.