BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2024 at 8:00 PM

Updated April 22, 2025

Renovation of a stadium in Austin, Texas. Completed plans call for the renovation of a stadium.

https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024023007 Project Name: GMP 3 Issue for Construction Project Number: TABS2024023007 Facility Name: Darrell K Royal Stadium Location Address: Bellmont Hall 2139 San Jacinto Blvd Austin, TX 78712 Location County: Travis Start Date: 9/30/2024 Completion Date: 11/4/2024 Estimated Cost: $20,600,000 Type of Work: Renovation/Alteration Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Interior renovation of Bellmont Hall L1 and L2. Square Footage: 59,108 ft 2 ------------------------------------------------------------ https://govmarketnews.com/university-of-texas-system-adds-175-million-projects-to-cip/ UT Austin will spend $80 million to renovate Bellmont Hall at UT Austin. Bellmont Hall is connected to the Darrel K. Royal (DKR) Texas Memorial Stadium. The 50-year-old building has outdated mechanical, electrical and plumbing systems and needs greater capacity to accommodate students’ needs. The university will renovate the Kinesiology and Health Education (KHE) classrooms and laboratory space on Levels 1, 2 and 9 as well as the football suites on Level 8. _______________________________________________________________ Questions Due Date: Jan 11th 2024, 12:00 PM CST. The University of Texas at Austin (Owner) is soliciting proposals (Proposals) for the selection of a Construction Manager-at-Risk for Planning, Design and Construction (PDC) Project No. 102-1506 - Darrel K Royal Texas Memorial Stadium Bellmont Hall Renovation Project (Project), in accordance with the terms, conditions, and requirements set forth in this Request for Proposals (RFP). The estimated Construction Cost Limitation (CCL) based on the provided feasibility study for the Project is $63,200,000.00. This project consists of renovations of approximately 53,100 gross square feet (GSF) for KHE on Levels 1, 2, and 9, and approximately 46,000 GSF for football suites and premium club on Level 8 to better serve the needs of the KHE and Athletics departments respectively. The South End Zone Media Center will include the addition of two independent structures on top of the existing South End Zone concourse. The eastern addition will be used for working media members during Gameday operations. The western addition will support facilities for the Visiting Team Athletics Director, four radio booths and additional seating for working media members. Gameday operations will be relocated to a structure to be built on Level 10 of the Northwest End Zone. This facility will house public announcement, DJ, scoreboard operator, videoboards and light show control, and supplemental gameday operations activities.

Post-Bid

Arenas / Stadiums

$63,200,000.00

Public - State/Provincial

Renovation

4

17

27

2

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
145
Bidding Soon
2,689
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2024

September 24, 2024

Project location map

2109 San Jacinto Blvd, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.